Contract No:
HK/2009/05 Wanchai Development Phase II and Central Wanchai Bypass Sampling, Field Measurement and Testing Work
(Stage 1) Environmental
Permit no. EP-356/2009, Further Evironmental permit nos. fep-01/356/2009,
fep-02/356/2009 and FEP-03/356/2009 Monthly Environmental Monitoring
& Audit Report
- August
2010 -
|
CLIENTS: |
|
Civil Engineering and
Development Department and Highways Department |
Lam Geotechnics Limited 11/F Centre Point 181-185 Gloucester Road, Wanchai,
H.K. Telephone: (852) 2882-3939 Facsimile: (852) 2882-3331 E-mail: info@lamenviro.com Website: http://www.lamenviro.com |
|
|
|
|
|
CHECKED
by: |
|
                         Raymond Dai Environmental Team Leader |
|
DATE: |
|
9 September 2010 |
1.1    Scope
of the Report
1.2    Structure
of the Report
2.   Project Background
2.1    Background
2.2    Scope
of the Project and Site Description
2.3    Division
of the Project Responsibility
2.4    Project
Organization and Contact Personnel
3.   status of regulatory compliance
3.1    Status
of Environmental Licensing and Permitting under the Project
4.   Monitoring Requirements
4.1    Noise
Monitoring
4.2    Air
Monitoring
4.3    Water
Quality Monitoring
5.   Monitoring Results
5.1    Noise
Monitoring Results
5.2    Air
Monitoring Results
5.3    Water Monitoring
Results
5.4    Waste
Monitoring Results
6.1    Noise
Monitoring
6.2    Air
Monitoring
6.3    Water
Quality Monitoring
6.4    Review
of the Reasons for and the Implications of Non-compliance
6.5    Summary
of action taken in the event of and follow-up on non-compliance
7.   Cumulative Construction Impact due to the Concurrent Projects
9.   Complaints, Notification
of Summons and Prosecution
lIST OF
TABLES
Table I      Summary of Water Quality Monitoring
Exceedances in Reporting Month
Table 2.1    Schedule 2 Designated Projects under this
Project
Table 2.2   Details of Individual Contracts under the
Project
Table 2.3   Contact Details of Key Personnel
Table 3.3   Summary of submission status under
FEP-01/356/2009 Condition
Table 3.5   Summary of submission status under
FEP-02/356/2009 Condition
Table 3.7   Summary of submission status under
FEP-03/356/2009 Condition
Table 4.1   Noise Monitoring Station
Table 4.2   Air Monitoring Station
Table 4.3    Marine Water Quality Stations for Water
Quality Monitoring
Table 4.4   Marine Water Quality Monitoring Frequency
and Parameters
Table 5.1    Noise Monitoring Stations for Contract
no. HY/2009/11
Table 5.2    Noise Monitoring Station for Contract nos.
HK/2009/01 and HK/2009/02
Table 5.3    Air Monitoring Stations for Contract no.
HY/2009/11
Table 5.4    Air Monitoring Stations for Contract no.
HK/2009/01
Table 5.5    Air Monitoring Station for Contract no.
HK/2009/02
Table 5.6    Water Monitoring Stations for Contract
no. HY/2009/11
Table 5.7    Water Monitoring Stations for Contract no.
HK/2009/01
Table 5.8    Water Monitoring Stations for Contract no.
HK/2009/02
Table 5.9    Summary of Water Quality Monitoring
Exceedances in Reporting Month
Table 5.10  Details of Waste Disposal for Contract no.
HY/2009/11
Table 5.11  Details of Waste Disposal for Contract no.
HK/2009/01
Table 5.12  Details of Waste Disposal for Contract no.
HK/2009/02
Table 8.1   Summary of Environmental Inspections for
Contract no. HY/2009/11
Table 8.2    Summary of Environmental Inspections for
Contract no. HK/2009/01
Table 8.3    Summary of Environmental Inspections for
Contract no. HK/2009/02
Table 9.1   Cumulative Statistics on Complaints
Table 9.2   Cumulative Statistics on Successful
Prosecutions
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table I ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Water Quality
Monitoring Exceedances in Reporting Month><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 2.1 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Schedule 2 Designated
Projects under this
Project><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 2.2><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Details of Individual
Contracts under the Project><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 2.3><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Contact Details of Key
Personnel><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.1><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of the current status
on licences and/or permits on environmental protection pertinent to the Project><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.2><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Cumulative Summary of Valid Licences and
Permits under Contract no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.3><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of submission status
under FEP-01/356/2009 Condition><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.4><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Cumulative Summary of Valid
Licences and Permits under Contract no. HK/2009/01><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.5><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of submission status under
FEP-02/356/2009 Condition><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.6><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Cumulative Summary of Valid
Licences and Permits under Contract no. HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 3.7><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of submission status
under FEP-03/356/2009 Condition><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 4.1><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Noise Monitoring Station><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 4.2><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Air Monitoring Station><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 4.3 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Marine Water Quality Stations
for Water Quality Monitoring><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 4.4><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Marine Water Quality
Monitoring Frequency and Parameters><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.1 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Noise Monitoring Stations for
Contract no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.2 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Noise Monitoring Station for Contract nos. HK/2009/01 and
HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.3 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Air Monitoring Stations for
Contract no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.4 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Air Monitoring Stations for
Contract no. HK/2009/01><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.5 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Air Monitoring Station for
Contract no. HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.6 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Water Monitoring Stations for Contract
no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.7 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Water Monitoring Stations for
Contract no. HK/2009/01><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.8 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Water Monitoring Stations for
Contract no. HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.9 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Water Quality
Monitoring Exceedances in Reporting Month><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.10><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Details of Waste Disposal for
Contract no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Details of Waste Disposal for
Contract no. HK/2009/01><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 5.12><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Details of Waste Disposal for
Contract no. HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 8.1><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Environmental
Inspections for Contract no. HY/2009/11><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 8.2 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Environmental
Inspections for Contract no. HK/2009/01><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 8.3 ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Environmental
Inspections for Contract no. HK/2009/02><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 9.1><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Cumulative Statistics on
Complaints><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 9.2><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Cumulative Statistics on
Successful Prosecutions><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 10.1><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Construction Activities and
Recommended Mitigation Measures in Coming Reporting Month><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Table 10.2><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">  >< cite="mailto:Lam20100204" datetime="2010-09-07T20:04">Summary of Key Construction
Activities of Individual Contract(s) to be commenced in Coming Reporting Month><
cite="mailto:Lam20100204" datetime="2010-09-07T20:04">
lIST OF FIGUREs
Figure
2.1     Project
Layout
Figure
2.2     Project
Organization Chart
Figure 4.1      Locations
of Environmental Monitoring Stations
lIST OF APPENDIces
Appendix 3.1   Environmental Mitigation Implementation
Schedule
Appendix 4.1   Action
and Limit Level
Appendix
4.2   Copies of Calibration
Certificates
Appendix
5.1   Monitoring Schedule for
Reporting Month and Coming month
Appendix 5.2   Noise Monitoring Results and Graphical
Presentations
Appendix 5.3   Air Quality Monitoring Results and Graphical Presentations
Appendix
5.4   Water
Quality
Monitoring Results and Graphical Presentations
Appendix 6.1   Event
Action Plans
Appendix 6.2   Summary for Notification of Exceedance< cite="mailto:Lam20100204" datetime="2010-09-07T20:05"> >
Appendix
9.1   Complaint Log
Appendix 10.1  Construction
Programme of Individual Contracts
i.
This is the Environmental
Monitoring and Audit (EM&A) Monthly Report  /span> August 2010 for
Contract No. HK/2009/05 –Wanchai Development Phase II and Central Wanchai
Bypass - Sampling,
Field Measurement and Testing Work (Stage 1). 
This report presents the environmental monitoring findings and
information recorded during the period 28th July 2010 to 27th
August 2010. The cut-off date of reporting is at 27th of
each reporting month.
Construction Activities for the
Reported Period
ii.
During this reporting period,
the major work activities for Contract no. HY/2009/11 included:
< cite="mailto:Lam20100204" datetime="2010-09-03T15:01"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T15:01"> >< cite="mailto:Lam20100204" datetime="2010-09-03T15:01">
 -
Construction of Rock
Mound,
 -
Floating Out of Caisson
Seawall,
 -
Installation of Caisson
Seawall,
 -
Dredging works,
 -
Filling works;
 -
Laying of geo-textile,
 -
Drainage Works; and
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:14"> -
>Seawall Block Installation<
cite="mailto:Lam20100204" datetime="2010-09-07T14:14">
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Construction of Rock
Mound,
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Floating Out of Caisson
Seawall,
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Installation of Caisson
Seawall,
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Dredging works,>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:14">
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Filling works><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Laying of geo-textile,
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:14"> -
><
cite="mailto:mansonyeung" datetime="2010-09-04T12:14">Drainage Works and
 -
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:14">Seawall Block Installation>
iii.
During this reporting
period, the major work activities for Contract no. HK/2009/01 included:
< cite="mailto:Lam20100204" datetime="2010-09-03T14:58"> -
>< cite="mailto:Lam20100204" datetime="2010-09-03T14:58"> >< cite="mailto:Lam20100204" datetime="2010-09-03T14:58">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:18"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:18">Erection of interim
Engineer’s Principal Office at Works areas WA2 was completed for moving-in on 5
Aug 10.
 -
Erection of interim
Engineer’s Principal Office at Works areas WA2
 -
Modification of CATV
combine service inspection chamber
 -
Installation of staging
piles for trial bored pile was completed and bored pile construction
 -
Marine site investigation
 -
Dredging works for cross
harbour watermains
 -
Dismantling of existing
sloping seawall and removal of armor rock at north-west side of water channel
is stopped and reinstating the rock slope at seawall
 -
Hoarding erection at Tsim
Sha Tsui Salisbury Garden area
 -
18m of artwork panel is
installed as design for other location
 -
Trial pits construction
for determination of pipeline alignment at Convention Avenue
 -
Fabrication of straight
sections of cross harbour submarine pipes and land water pipes
 -
Elbow sections of cross
harbour submarine pipes are being fabricated.
 -
The assemble of 6 nos. of
tailor made flat top barge was commenced on 14 Aug 10. The fabrication of
dredging crane was completed and will be installed on the tailor make flat top
barge on 21 Aug 10 and ready for dredging by 15 Sept 10 tentatively.
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:17">Modification of CATV combine service inspection
chamber is ongoing.
iv. >>>>>>>
>>>>>>>>>>>>>
>During this reporting
period, the major work activities for Contract no. HK/2009/02 included:
 -
Hoarding Erection;
 -
Pre-bored H-piles, ELS
and excavation at WSD Pumping Station;
 -
Construction of Salt
Water Intake Culvert at Pet Garden;
 -
Road Modification Works;
 -
Construction of Cooling Mains
Along Public Road;
 -
Construction of Temporary
Seawall;
 -
Dredging for WCR 1;
 -
Tree Transplanting; and
 -
Equipments Procurement
for TKO 137
< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">S><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">ite >< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">C><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">learance>< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Hoarding >< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">E><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">rection>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Pre-bored H-piles, ELS
and excavation at WSD Pumping Station><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:20"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">Construction of >< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Salt
Water Intake Culvert at Pet Garden>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:20"> />< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Road >< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">M><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">odification Works>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">Construction of Cooling Mains Along Public Road><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Construction of >< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">T><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">emporary >< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">S><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">eawall>< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> />< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">D><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20">redging>< cite="mailto:mansonyeung" datetime="2010-09-04T12:20"> for
WCR 1>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20"> />< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Tree
Transplanting>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:19"> />< cite="mailto:mansonyeung" datetime="2010-09-04T12:20">Equipments
>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:20">Procurement><
cite="mailto:mansonyeung" datetime="2010-09-04T12:20"> for TKO 137>< cite="mailto:Lam20100204"
datetime="2010-09-07T14:19">
Noise Monitoring
v.
Noise monitoring during
day time and evening time were conducted at the City Garden, Victoria Centre and
Harbour Road Sports Center on a weekly basis in the reporting month. Two action level
exceedances were recorded due to the receipt of two noise complaints dated 31 July and 12 August
2010 regarding
the noise nuisance generated from the dredging works at North Point. Three limit level exceedances were recorded at Harbour Road Sports
Centre on 3,
10 and 17 August 2010 during the evening time period.  /span>Investigation found that exceedances were not related to the Project. < cite="mailto:mansonyeung" datetime="2010-09-02T19:18">Noise
monitoring during >< cite="mailto:mansonyeung"
datetime="2010-09-02T19:18">day time and evening time>< cite="mailto:mansonyeung" datetime="2010-09-02T19:18"> were
conducted at the City Garden on a weekly basis in the reporting period. >< cite="mailto:mansonyeung" datetime="2010-09-02T19:18">Two
limit level exceedances were recorded at M4a on 20 and 27 July 2010 during
restricted hours. Investigation found that is not project related exceedances. >< cite="mailto:mansonyeung"
datetime="2010-09-02T19:18">Reviewed the past monitoring results and
observation at Station M4a, Victoria Centre (Station ID: M4b) is proposed as
alternative noise monitoring ><
cite="mailto:mansonyeung" datetime="2010-09-02T19:18">station>< cite="mailto:mansonyeung" datetime="2010-09-02T19:18"> from
August 2010.>
< cite="mailto:Lam20100204"
datetime="2010-09-07T20:10"> >< cite="mailto:Lam20100204" datetime="2010-09-07T20:10">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:23">Noise monitoring during
daytime>< cite="mailto:Lam20100204"
datetime="2010-09-07T14:23"> ><
cite="mailto:Lam20100204" datetime="2010-09-07T14:23">w>< cite="mailto:Lam20100204" datetime="2010-09-07T14:23">as>< cite="mailto:Lam20100204" datetime="2010-09-07T14:23">
conducted at the >< cite="mailto:Lam20100204"
datetime="2010-09-07T14:23">M1a ><
cite="mailto:Lam20100204" datetime="2010-09-07T14:23"> />< cite="mailto:Lam20100204" datetime="2010-09-07T14:23">
Harbour Road Sports Centre in this reporting month. >< cite="mailto:mansonyeung" datetime="2010-09-02T19:21">Due to
the marine works undertaken in evening time from 12 July 2010, noise monitoring
during evening time was conducted from 13 July 2010. >< cite="mailto:Lam20100204" datetime="2010-09-07T14:23">Three
limit level exceedances were recorded ><
cite="mailto:Lam20100204" datetime="2010-09-07T14:23">at 3, 10 and 17 during
restricted hour><
cite="mailto:mansonyeung" datetime="2010-09-02T19:22">in reporting month. It is
concluded as not related to the Project works. However, baseline noise level at
M1 needs to be reviewed in next ><
cite="mailto:mansonyeung" datetime="2010-09-02T19:22">reporting>< cite="mailto:mansonyeung" datetime="2010-09-02T19:22"> month.><
cite="mailto:Lam20100204" datetime="2010-09-07T14:23">Investigation found that
is not project related exceedances. ><
cite="mailto:Lam20100204" datetime="2010-09-07T14:23">
Air Quality Monitoring
vi.
As <
cite="mailto:Lam20100204" datetime="2010-09-07T14:25">no >filling
works for Contract
no. HY/2009/11
was < cite="mailto:Lam20100204"
datetime="2010-09-07T14:40">carried>commenced <
cite="mailto:Lam20100204" datetime="2010-09-07T14:40"> /span>><
cite="mailto:Lam20100204" datetime="2010-09-07T14:41">out >in mid-< cite="mailto:Lam20100204" datetime="2010-09-07T14:41">reporting
month>August
2010, < cite="mailto:Lam20100204"
datetime="2010-09-07T14:41">n><
cite="mailto:Lam20100204" datetime="2010-09-07T14:41">o >air
quality monitoring at
stations CMA1b  /ins> Oil Street Community Liaison
Centre and
CMA2a  Causeway Bay Community Centre <
cite="mailto:Lam20100204" datetime="2010-09-07T14:42">was >were < cite="mailto:Lam20100204" datetime="2010-09-08T11:02">undertaken>commenced < cite="mailto:Lam20100204" datetime="2010-09-07T14:42">during >on 11 August 2010< cite="mailto:Lam20100204" datetime="2010-09-08T11:02">the
reporting month>. One action level exceedance of 1hour TSP was
recorded at CMA1b on 24 August 2010. Investigation found that exceedance was not related to the
Project.
Water Quality Monitoring
vii.
Water quality monitoring
at 17 monitoring stations < cite="mailto:Lam20100204"
datetime="2010-09-07T14:44">were>was conducted three days per week during the
reporting period.  /span>The action and limit
level exceedances of water quality monitoring are summarized in Table I.
Investigations were found that the exceedances are not related to the Project
works. The details of the exceedances can be referred to Section 5.3 and 6.3 of
the report.
Table I     Summary of Water Quality Monitoring Exceedances in Reporting
Month
Contract
no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
||||||||
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
||
HY/2009/11 |
WSD9 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
|
WSD10 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">5> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
WSD15 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">4> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
WSD17 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">5> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
|
C8 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">4> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
2 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">5> |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
|
C9 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
3 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">4> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
HK/2009/01 |
WSD19 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
WSD20 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
2 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
WSD7 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
C1 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
C2 |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
|
C3 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
C4e |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
2 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
C4w |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
HK/2009/02 |
C5e |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
C5w |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
|
WSD21 |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
1 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 <
cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">1> |
Total |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">11> |
2 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">11> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">0> |
5 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">18> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">16> |
7 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">22> |
6 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">24> |
0 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">3> |
2 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2> |
1 < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">15> |
6 < cite="mailto:Lam20100204"
datetime="2010-09-07T14:45">8> |
Complaints, Notifications of
Summons and Successful Prosecutions
viii.
< cite="mailto:mansonyeung" datetime="2010-09-02T19:30">No
complaint>< cite="mailto:Lam20100204" datetime="2010-09-07T14:45">2>Two noise complaints were
recorded on 3< cite="mailto:Lam20100204"
datetime="2010-09-08T20:15">0>1 July and 12 August 2010 regarding noise nuisance
generated from the dredging works < cite="mailto:Lam20100204" datetime="2010-09-07T14:45">between 1900 and 0800 >in North
Point district.
Investigation found that the complaints were considered not valid
from the Environmental
Permit and Construction Noise Permit point of view.
< cite="mailto:Lam20100204" datetime="2010-09-07T14:47">i.><
cite="mailto:Lam20100204" datetime="2010-09-07T14:46">,>< cite="mailto:Lam20100204"
datetime="2010-09-07T14:46"> ><
cite="mailto:mansonyeung" datetime="2010-09-02T19:31">notification of summons
and prosecution was recorded in ><
cite="mailto:mansonyeung" datetime="2010-09-02T19:31">reporting>< cite="mailto:mansonyeung" datetime="2010-09-02T19:31"> month.>< cite="mailto:Lam20100204" datetime="2010-09-07T14:47">
Site Inspections and Audit
ix.
The Environmental Team
(ET) conducted weekly site inspections for Contract nos. HY/2009/11, HK/2009/01
and HK/2009/02 in this reporting period. Major observations and recommendations
made during the audit sessions were rectified by the Contractors. No non-conformance
was identified during the site inspections.
x.
In coming reporting month,
the principal work activities of individual contracts are anticipated as follows:
Contract no. HY/2009/11- North Point Reclamation
 -
Floating Out of Caisson
Seawall,
 -
Installation of Caisson
Seawall,
 -
Dredging works,
 -
Filling works;
 -
Construction of Seawall
Block,
 -
Works for Fenders and
rubber steps and Drainage works
< cite="mailto:mansonyeung" datetime="2010-09-04T12:23">Floating>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23"> Out of Caisson Seawall,
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Installation of Caisson Seawall,
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Dredging works,>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Filling works>< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Construction of Seawall Block,
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:23"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Works for Fenders and rubber steps and
<
cite="mailto:Lam20100204" datetime="2010-09-03T15:02"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:23">Drainage works>< cite="mailto:Lam20100204" datetime="2010-09-03T15:02">
<
cite="mailto:Lam20100204" datetime="2010-09-03T15:02"> />< cite="mailto:Lam20100204"
datetime="2010-09-03T15:02"> >< cite="mailto:Lam20100204" datetime="2010-09-03T15:02">
Contract no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai
Bypass at HKCEC
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:49">Installation of pipe pile
wall at West Bridge
 -
Installation of pipe pile
wall at West Bridge
 -
Installation of trial
bored pile
 -
Assembly of crane to the
custom made dredger
 -
Dredging works for cross
harbour watermains
 -
Construction of wheel
washing facilities
 -
Commencement of temporary
jetty construction
 -
Implementation of TTM
scheme for trial pit at Convention Avenue (Area A1) and Harbour Road (Area A5)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Convention Avenue (Area A1)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for salt water main and optic fibre at Harbour
Road (Area A5)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Expo Drive near HKCEC (Area B1)
 -
Tree transplantation at
Wan Chai and Tsim Sha Tsui
 -
Builder’s work and
structural modification for Sea water pump houses / Transformer room of HKCEC
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Installation of trial bored pile
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Assembly of crane to the custom made dredger
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Dredging works for cross harbour watermains
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Construction of wheel washing facilities
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Commencement of temporary jetty construction
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Implementation of TTM scheme for trial pit at
Convention Avenue (Area A1) and Harbour Road (Area A5)
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Implementation of TTM scheme for Stage 1 pipe
laying for cooling mains and cross harbour water main at Convention Avenue
(Area A1)
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Implementation of TTM scheme for Stage 1 pipe
laying for salt water main and optic fibre at Harbour Road (Area A5)
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Implementation of TTM scheme for Stage 1 pipe
laying for cooling mains and cross harbour water main at Expo Drive near HKCEC
(Area B1)
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Tree transplantation at Wan Chai and Tsim Sha Tsui
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49">Builder’s work and structural modification for Sea water 
pump houses / Transformer room of HKCEC
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:49">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:49">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:49">
< cite="mailto:Lam20100204" datetime="2010-09-07T14:49"> >< cite="mailto:Lam20100204" datetime="2010-09-07T14:49">
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Installation of pipe pile
wall at West Bridge
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Installation of trial
bored pile
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Assembly of crane to the
custom made dredger
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Dredging works for cross
harbour watermains
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Construction of wheel
washing facilities
< cite="mailto:mansonyeung"
datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Commencement of temporary
jetty construction
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Implementation of TTM
scheme for trial pit at Convention Avenue (Area A1) and Harbour Road (Area A5)
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Convention Avenue (Area A1)
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Implementation of TTM
scheme for Stage 1 pipe laying for salt water main and optic fibre at Harbour
Road (Area A5)
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Expo Drive near HKCEC (Area B1)
<
cite="mailto:mansonyeung" datetime="2010-09-04T12:24"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T12:24">Tree transplantation at
Wan Chai and Tsim Sha Tsui
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:49"> />< cite="mailto:mansonyeung"
datetime="2010-09-04T12:24">Builder’s work and structural modification for Sea
water pump houses / Transformer room of HKC>< cite="mailto:Lam20100204" datetime="2010-09-07T14:49">
Contract no. HK/2009/02 - Wan Chai Development Phase II  Central  Wan
Chai Bypass at WanChai East
 -
Site Clearance;
 -
Hoarding Erection;
 -
Pre-bored H-piles, ELS
and excavation at WSD Pumping Station;
 -
Construction of Salt
Water Intake Culvert at Pet Garden;
 -
Road Modification Works;
 -
Construction of Cooling
Mains Along Public Road;
 -
Construction of Temporary
Seawall;
 -
Dredging for WCR 1;
 -
Tree Transplanting; and
 -
Equipments Procurement
for TKO 137
1.1.1.
Lam Geotechnics Limited (LGL) has
been appointed to work as the
Environmental Team (ET) for Contractor No. HK/2009/05
Wan Chai Development Phase II and Central –Wan Chai Bypass  Sampling, Field
Measurement and Testing Work (Stage 1) to implement the Environmental Monitoring and Audit
(EM&A) programme as stipulated in the EM&A Manual of the
approved Environmental Impact Assessment (EIA) Report for Wan Chai Development
phase II and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008) and in the
EM&A Manual of the approved EIA Report for Central-Wan Chai Bypass and
Island Eastern Corridor Link (Register No. AEIAR-014/2001).
1.1.2.
This report presents the environmental monitoring and
auditing work carried out in accordance to the Section
10.3 of EM&A Manual
and  /span>Environmental Monitoring and Audit
Requirements /span>
under Particular Specification Section 27.
1.1.3.
This report documents the
finding of EM&A works for Environmental Permit no. EP-356/2009, Further
Environmental Permit no. FEP-01/2009, FEP-02/2009 and FEP-03/2009 during the period 28th July to 27th August 2010. The
cut-off date of reporting is at 27th of each reporting month.
Section 1     Introduction
 details the scope and structure of the report.
Section 2     Project
Background  summarizes background and scope of the
project, site description, project organization and contact details of key
personnel during the reporting period.
Section 3     Status of Regulatory Compliance
 summarizes the status of valid Environmental Permits / Licenses during the
reporting period.
Section 4     Monitoring
Requirements
 summarizes all monitoring parameters, monitoring methodology and equipment,
monitoring locations, monitoring frequency, criteria and respective event and
action plan and monitoring programmes.
Section 5     Monitoring
Results  summarizes the monitoring results
obtained in the reporting period.
Section 6     Compliance
Audit  summarizes the auditing of
monitoring results, all exceedances environmental parameters.
Section 7     Cumulative Construction Impact due to the
Concurrent Projects  summarizes the relevant cumulative construction
impact due to the concurrent activities of the concurrent Projects.
Section 8     Site Inspection  
summarizes the findings of weekly site inspections undertaken within the
reporting period, with a
review of any relevant follow-up actions within the
reporting period.
Section 9     Complaints, Notification of summons and Prosecution
 summarizes the cumulative statistics on complaints,
notification of summons and prosecution
Section 10    Conclusion
2.1.1.
“Wan Chai Development phase II and Central-Wan Chai
Bypass and “Central-Wan Chai Bypass and Island Eastern Corridor Link 
(hereafter called “the Project  are Designed Project (DP) under the
Environmental Impact Assessment Ordinance (Cap. 499) (EIAO). The Environmental Impact Assessment (EIA)
Reports for Central-Wan Chai Bypass and Island Eastern Corridor Link (Register No.
AEIAR-041/2001) and Wan Chai Development phase II and Central-Wan Chai Bypass
(Register No.: AEIAR-125/2008) have been approved on 31 August 2001 and 11
December 2008 respectively.
2.1.2.
The key purpose of Wan Chai Development Phase II
(WDII) is to provide land at Wan Chai North and North Point for construction of
the Central-Wan Chai Bypass and Island Eastern Corridor Link (CWB). Land formed
under the project will be developed as a world-class waterfront promenade
joining that at the new Central waterfront for public enjoyment.
2.1.3.
There is a compelling and present need for the CWB to
provide relief to the very congested east-west Connaught Road Central/Harcourt
Road / Gloucester Road Corridor (the Corridor) which is currently operating
beyond its capacity. The CWB will provide relief to the existing congestion
along the Corridor and cater for the anticipated growth of traffic on Hong Kong
Island. Without the CWB and its access roads, there will not be sufficient
capacity to serve the heavy traffic demands at both strategic and local levels.
2.2.1.
The Project is located mainly in Wan Chai North,
Causeway Bay and North Point, and is demarcated by Gloucester Road and Victoria
Park Road to the south, Fenwick Pier Street to the west and Tong Shui Road
Interchange to the east, as shown in Figure 2.1.
2.2.2.
The study area encompasses existing developments
along the Wan Chai, Causeway Bay and North Point shorelines. Major land uses include
the Hong Kong Convention & Exhibition Centre (HKCEC) Extension, the Wan
Chai Ferry Pier, the ex-Wan Chai Public Cargo Working Area (ex-PCWA), the Royal
Hong Kong Yacht Club (RHKYC), the Police Officers' Club, the Causeway Bay
Typhoon Shelter (CBTS) and commercial and residential developments.
2.2.3.
The
scope of the Project comprises:
 -
Land formation for key
transport infrastructure and facilities, including the Trunk Road (i.e.
CWB) and the associated slip roads for connection to the Trunk Road and for through
traffic from Central to Wan Chai and Causeway Bay. The land formed for the above
transport infrastructure will provide opportunities for the development of an
attractive waterfront promenade for the enjoyment of the public
 -
Reprovisioning /
protection of the existing facilities and structures affected by the land
formation works mentioned above
 -
Extension, modification,
reprovisioning or protection of existing storm water drainage outfalls,
sewerage outfalls and watermains affected by the revised land use and land
formation works mentioned above
 -
Upgrading of hinterland
storm water drainage system and sewerage system, which would be rendered
insufficient by the land formation works mentioned above
 -
Provision of the ground
level roads, flyovers, footbridges, necessary transport facilities and the
associated utility services
 -
Construction of the new
waterfront promenade, landscape works and the associated utility services
 -
The
Trunk Road (i.e. CWB) within the study area and the associated slip roads for
connection to the Trunk Road.
2.2.4.
The project also contains various Schedule 2 DPs
that, under the EIAO, require Environmental Permits (EPs) to be granted by the
DEP before they may be either constructed or operated. Table 2.1 summarises the
five individual DPs under this Project. Figure 2.1
shows the locations of these Schedule 2 DPs.
Table 2.1   Schedule 2 Designated Projects under this
Project
Item |
Designated Project |
EIAO Reference |
Reason for inclusion |
DP1 |
Central-Wanchai Bypass (CWB) including its road tunnel and slip roads |
Schedule 2, Part I, A.1 and A.7 |
Trunk road and road tunnel more than 800 m in length |
DP2 |
Road P2 and other roads which are classified as primary/district
distributor roads |
Schedule 2, Part I, A.1 |
Primary / district distributor roads |
DP3 |
Reclamation works including associated dredging works |
Schedule 2, Part I, C.1 and C.12 |
Reclamation more than 5 ha in size and a dredging operation less than
100 m from a seawater intake point |
DP5 |
Wan Chai East Sewage Outfall |
Schedule 2, Part I, F.5 and F.6 |
Submarine sewage pipelines with a total diameter more than 1,200 mm
and include a submarine sewage outfall |
DP6 |
Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha
Tsui |
Schedule 2, Part I, C.12 |
A dredging operation less than 100 m from a seawater intake point |
2.3.1.
Due to the multi-contract nature of the Project,
there are a number of contracts sub-dividing the whole works area into
different work areas to be commenced. 
Contractors of individual contracts will be required by the EP holder to
apply Further Environmental Permits (FEP) such that the impact monitoring
stations are sub-divided accordingly to facilitate the implementation of
EM&A programme and to streamline the EM&A reporting for individual FEP
holders correspondingly.
2.3.2.
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:52">In the reporting month, >< cite="mailto:Lam20100204" datetime="2010-09-07T14:52">the
dredging works for Contracts no. HK/2009/01 and HK/2009/02 were commenced on 23
July and 5 July 2010 respectively><
cite="mailto:Lam20100204" datetime="2010-09-07T14:52">. >The details of individual
contracts are summarized in Table 2.2.
Table 2.2  Details of Individual Contracts under the
Project
Contract No. |
Contract Title |
Associated DP(s) |
Construction Commencement Date |
HK/2009/01 |
Wan Chai Development Phase II  Central –Wanchai Bypass at Hong Kong
Convention and Exhibition Centre |
DP3, DP6 |
23 July 2010 |
DP1, DP2 |
Pending |
||
HK/2009/02 |
Wan Chai Development Phase II  Central  Wan Chai Bypass at WanChai
East |
DP3, DP5 |
5 July 2010 |
DP1 |
Pending |
||
HY/2009/11 |
Wan Chai Development Phase II and Central - Wan Chai Bypass - North
Point Reclamation |
DP3 |
17 March 2010 |
2.4.1.
Civil Engineering and
Development Department and Highways Department are the overall project
controllers for the Wan Chai Development Phase II and Central-Wan Chai Bypass
respectively.
For the construction phase of the Project, Project Engineer, Contractor(s),
Environmental Team and Independent Environmental Checker are appointed to
manage and control environmental issues.
2.4.2.
The proposed project organization and lines of
communication with respect to environmental protection works are shown in Figure 2.2. Key personnel and contact particulars are
summarized in Table 2.3:
Table 2.3  Contact Details of Key Personnel
Party |
Role |
Post |
Name |
Contact No. |
Contact Fax |
AECOM |
Engineer for WDII |
Principle Resident Engineer |
Mr. Frankie Fan |
2607 7801 |
2687 2322 |
Engineer for CWB |
Chief Resident Engineer |
Mr. David Kwan |
3916 1818 |
3529 2829 |
|
China Harbour- CRBC Joint Venture |
Contractor under Contract no. HY/2009/11 |
Project Director |
Mr. Cho Yu Fun |
3157 1086 |
3157 1085 |
Project Manager |
Mr. Gregory Wong |
3157 1086 |
|||
Site Agent |
Mr.
Daniel Cheung |
3157 1086 |
|||
Environmental Officer |
Mr. C. M. Wong |
3157 1086 |
|||
Chun Wo  Leader Joint Venture |
Contractor under Contract no. HK/2009/01 |
Site Agent |
Paul Yu |
9456 9819 |
2634 1626 |
Operation Manager |
Lau Yee Ching< cite="mailto:mansonyeung"
datetime="2010-09-04T13:03">Ho Wing Tai> |
9466 3918< cite="mailto:mansonyeung"
datetime="2010-09-04T13:03">9306 1356> |
|||
Construction Manager |
David Wong |
9653 8635 |
|||
Construction Manager |
Wilson Lau |
5183 1270 |
|||
Construction Manager |
Chan Mui Sang< cite="mailto:mansonyeung"
datetime="2010-09-04T13:03">Alex Tsang> |
9864 8615< cite="mailto:mansonyeung"
datetime="2010-09-04T13:03">9194 9383> |
|||
Environmental Officer
(Compliance Manager) |
Brian Wan< cite="mailto:mansonyeung"
datetime="2010-09-04T13:04">Ho Wing Tai> |
9312 2827< cite="mailto:mansonyeung"
datetime="2010-09-04T13:04">9306 1356> |
|||
Environmental Engineer |
Shelton Chan< cite="mailto:mansonyeung"
datetime="2010-09-04T13:04">Ken Yang> |
5395 5470<
cite="mailto:mansonyeung" datetime="2010-09-04T13:04">9262 6791> |
|||
Chun Wo  CRGL Joint Venture |
Contractor under Contract no. HK/2009/02 |
Project Manager |
Mr. Chan Sing Cho |
3658 3002 |
2827 9996 |
Site Agent |
Mr. Eric Lam<
cite="mailto:mansonyeung" datetime="2010-09-04T13:04">Mr. Anthony Wu> |
3658-3048<
cite="mailto:mansonyeung" datetime="2010-09-04T13:04">3658 3004> |
|||
Environmental Officer (Compliance Manager) |
Mr. Barry Leung |
3658 3031 |
|||
Environmental Engineer |
Ms. Flora Ng |
3658-3064 |
|||
ENVIRON Hong Kong Limited |
Independent
Environmental Checker (IEC) |
Independent
Environmental Checker (IEC) |
Mr. David Yeung |
3743 0788 |
3548 6988 |
Lam Geotechnics Limited |
Environmental Team (ET) |
Environmental Team Leader (ETL) |
Mr. Raymond Dai |
2882 3939 |
2882 3331 |
2.4.3.
For Contract no. HY/2009/11, the principal work activities in this
reporting month included:
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Construction of Rock
Mound,
 -
Construction of Rock
Mound,
 -
Floating Out of Caisson
Seawall,
 -
Installation of Caisson
Seawall,
 -
Dredging works,
 -
Filling works;
 -
Laying of geo-textile,
 -
Drainage Works and
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
>Seawall Block
Installation< cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Floating
Out of Caisson Seawall,
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Installation of Caisson
Seawall,
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Dredging works,
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Laying of geo-textile,
 -
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Drainage Works and Seawall
Block Installation>
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Construction of Rock
Mound,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Floating Out of Caisson
Seawall,
< cite="mailto:mansonyeung" datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Installation of Caisson
Seawall,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Dredging works,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Filling works;
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Laying of geo-textile,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Drainage Works and
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:53"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Seawall Block
Installation>< cite="mailto:Lam20100204"
datetime="2010-09-07T14:53">
< cite="mailto:Lam20100204" datetime="2010-09-03T16:56"> >< cite="mailto:Lam20100204" datetime="2010-09-03T16:56">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:53"> >< cite="mailto:Lam20100204" datetime="2010-09-07T14:53">
2.4.4.
For Contract no. HK/2009/01, the principal work activities in
this reporting month included:
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
>< cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> >< cite="mailto:Lam20100204" datetime="2010-09-07T14:54">
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> -
><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Erection of interim
Engineer’s Principal Office at Works areas WA2 was completed for moving-in on 5
Aug 10.
 -
Erection of interim
Engineer’s Principal Office at Works areas WA2
 -
Modification of CATV
combine service inspection chamber
 -
Installation of staging
piles for trial bored pile was completed and bored pile construction
 -
Marine site investigation
 -
Dredging works for cross
harbour watermains
 -
Dismantling of existing
sloping seawall and removal of armor rock at north-west side of water channel
is stopped and reinstating the rock slope at seawall
 -
Hoarding erection at Tsim
Sha Tsui Salisbury Garden area
 -
18m of artwork panel is
installed as design for other location
 -
Trial pits construction
for determination of pipeline alignment at Convention Avenue
 -
Fabrication of straight
sections of cross harbour submarine pipes and land water pipes
 -
Elbow sections of cross
harbour submarine pipes are being fabricated.
 -
The assemble of 6 nos. of
tailor made flat top barge was commenced on 14 Aug 10. The fabrication of
dredging crane was completed and will be installed on the tailor make flat top
barge on 21 Aug 10 and ready for dredging by 15 Sept 10 tentatively.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Modification of CATV
combine service inspection chamber is ongoing.
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Installation of staging
piles for trial bored pile was completed and bored pile construction is in
progress.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Marine site investigation
was completed.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Dredging works for cross
harbour watermains is on going.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Dismantling of existing
sloping seawall and removal of armor rock at north-west side of water channel
is stopped and reinstating the rock slope at seawall is in progress.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Hoarding erection at Tsim
Sha Tsui Salisbury Garden area is completed on 18/08/10. However, only 18m of
artwork panel is installed as design for other location has yet been finalized
from the Engineer.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Trial pits construction
for determination of pipeline alignment at Convention Avenue is ongoing.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Fabrication of straight
sections of cross harbour submarine pipes and land water pipes was completed.
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">Elbow sections of cross
harbour submarine pipes are being fabricated.
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">The assemble of 6 nos. of
tailor made flat top barge was commenced on 14 Aug 10. The fabrication of
dredging crane was completed and will be installed on the tailor make flat top
barge on 21 Aug 10 and ready for dredging by 15 Sept 10 tentatively. >< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54">
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54"> /><
cite="mailto:Lam20100204" datetime="2010-09-07T14:54">The registration of 3 mud
barges had been fully licensed. Demonstration to EPD for operation is on going.>< cite="mailto:Lam20100204"
datetime="2010-09-07T14:54">
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06">Erection of interim Engineer’s Principal Office at
Works areas WA2
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Modification of CATV combine
service inspection chamber
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Installation of staging
piles for trial bored pile was completed and bored pile construction
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Marine site investigation
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Dredging works for cross
harbour watermains
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Dismantling of existing
sloping seawall and removal of armor rock at north-west side of water channel
is stopped and reinstating the rock slope at seawall
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Hoarding erection at Tsim
Sha Tsui Salisbury Garden area
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">18m of artwork panel is
installed as design for other location
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Trial pits construction
for determination of pipeline alignment at Convention Avenue
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Fabrication of straight
sections of cross harbour submarine pipes and land water pipes
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">Elbow sections of cross
harbour submarine pipes are being fabricated.
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:06"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:06">The assemble of 6 nos. of
tailor made flat top barge was commenced on 14 Aug 10. The fabrication of
dredging crane was completed and will be installed on the tailor make flat top
barge on 21 Aug 10 and ready for dredging by 15 Sept 10 tentatively.>< cite="mailto:mansonyeung" datetime="2010-09-04T13:06">
<
cite="mailto:Lam20100204" datetime="2010-09-07T14:54"> >< cite="mailto:Lam20100204" datetime="2010-09-07T14:54">
2.4.5.
For Contract no. HK/2009/02, the principal work activities in
this reporting month included:
 -
Site Clearance
 -
Hoarding Erection
 -
Pre-bored H-piles, ELS
and excavation at WSD Pumping Station
 -
Construction of Salt
Water Intake Culvert at Pet Garden
 -
Road Modification Works
 -
Construction of Cooling
Mains Along Public Road
 -
Construction of Temporary
Seawall
 -
Dredging for WCR 1
 -
Tree Transplanting
 -
Equipments Procurement
for TKO 137
< cite="mailto:Lam20100204" datetime="2010-09-07T14:55"> >< cite="mailto:Lam20100204" datetime="2010-09-07T14:55">
2.4.6.
In coming reporting month, the principal work
activities of individual contracts are anticipated as follows:
Contract
no. HY/2009/11- North Point Reclamation
 -
Floating Out of Caisson
Seawall,
 -
Installation of Caisson
Seawall,
 -
Dredging works,
 -
Filling works;
 -
Construction of Seawall
Block,
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:55"> -
>Works for Fenders and
rubber steps and Drainage works<
cite="mailto:Lam20100204" datetime="2010-09-07T14:55">
< cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Floating
Out of Caisson Seawall,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> -
>< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07">Installation of Caisson Seawall,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> -
>< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07">Dredging works,
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> -
>< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07">Filling works
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> -
>< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07">Construction of Seawall Block,
< cite="mailto:mansonyeung" datetime="2010-09-04T13:07"> -
>< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07">Works for Fenders and rubber steps and
< cite="mailto:Lam20100204"
datetime="2010-09-07T14:55"> -
>< cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Drainage
works>< cite="mailto:Lam20100204" datetime="2010-09-07T14:55">
<
cite="mailto:Lam20100204" datetime="2010-09-03T16:56"> >< cite="mailto:Lam20100204" datetime="2010-09-03T16:56">
 -
Contract
no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai Bypass at
HKCEC
 -
Installation of pipe pile
wall at West Bridge
 -
Installation of trial
bored pile
 -
Assembly of crane to the
custom made dredger
 -
Dredging works for cross
harbour watermains
 -
Construction of wheel
washing facilities
 -
Commencement of temporary
jetty construction
 -
Implementation of TTM
scheme for trial pit at Convention Avenue (Area A1) and Harbour Road (Area A5)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Convention Avenue (Area A1)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for salt water main and optic fibre at Harbour
Road (Area A5)
 -
Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Expo Drive near HKCEC (Area B1)
 -
Tree transplantation at
Wan Chai and Tsim Sha Tsui
 -
Builder’s work and
structural modification < cite="mailto:Lam20100204"
datetime="2010-09-07T14:56">for Sea>for Sea <
cite="mailto:Lam20100204" datetime="2010-09-07T14:56">water pump>water pump houses / Transformer
room of HKCEC
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Installation of pipe pile
wall at West Bridge
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Installation of trial
bored pile
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Assembly of crane to the
custom made dredger
< cite="mailto:mansonyeung" datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Dredging works for cross
harbour watermains
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Construction of wheel
washing facilities
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Commencement of temporary
jetty construction
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Implementation of TTM
scheme for trial pit at Convention Avenue (Area A1) and Harbour Road (Area A5)
< cite="mailto:mansonyeung" datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Convention Avenue (Area A1)
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Implementation of TTM
scheme for Stage 1 pipe laying for salt water main and optic fibre at Harbour
Road (Area A5)
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Implementation of TTM
scheme for Stage 1 pipe laying for cooling mains and cross harbour water main
at Expo Drive near HKCEC (Area B1)
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Tree transplantation at
Wan Chai and Tsim Sha Tsui
< cite="mailto:mansonyeung"
datetime="2010-09-04T13:07"> /><
cite="mailto:mansonyeung" datetime="2010-09-04T13:07">Builder’s work and
structural modification for Sea water pump houses / Transformer room of HKCEC>< cite="mailto:mansonyeung" datetime="2010-09-04T13:07">
< cite="mailto:Lam20100204"
datetime="2010-09-03T16:56"> />< cite="mailto:Lam20100204" datetime="2010-09-03T16:56"> >< cite="mailto:Lam20100204" datetime="2010-09-03T16:56">
< cite="mailto:Lam20100204"
datetime="2010-09-03T16:56"> />< cite="mailto:Lam20100204" datetime="2010-09-03T16:56"> >< cite="mailto:Lam20100204" datetime="2010-09-03T16:56">
< cite="mailto:Lam20100204"
datetime="2010-09-03T16:56"> />< cite="mailto:Lam20100204" datetime="2010-09-03T16:56"> >< cite="mailto:Lam20100204" datetime="2010-09-03T16:56">
Contract
no. HK/2009/02 - Wan Chai Development Phase II  Central  Wan Chai Bypass at
WanChai East
 -
Site Clearance;
 -
Hoarding Erection;
 -
Pre-bored H-piles, ELS
and excavation at WSD Pumping Station;
 -
Construction of Salt
Water Intake Culvert at Pet Garden;
 -
Road Modification Works;
 -
Construction of Cooling
Mains Along Public Road;
 -
Construction of Temporary
Seawall;
 -
Dredging for WCR 1;
 -
Tree Transplanting; and
 -
Equipments Procurement
for TKO 137
<
cite="mailto:mansonyeung" datetime="2010-09-02T19:34"> >< cite="mailto:mansonyeung" datetime="2010-09-02T19:34">
< cite="mailto:mansonyeung"
datetime="2010-09-02T19:34"> />< cite="mailto:mansonyeung" datetime="2010-09-02T19:34"> >< cite="mailto:mansonyeung" datetime="2010-09-02T19:34">
3.1.1.
A summary of the current status on licences and/or
permits on environmental protection pertinent to the Project is shown in Table
3.1.
Permits and/or Licences |
Reference No. |
Issued Date |
Status |
Environmental
Permit |
EP-356/2009 |
30 Jul
2009 |
Valid |
Environmental
Permit |
EP-364/2009/A |
4 Aug < cite="mailto:Lam20100204" datetime="2010-09-08T19:03">17
Aug 2009>2010 |
Valid |
Environmental Permit |
EP-364/2009/ |
17 Aug 2009 |
Susperseded |
Environmental
Permit |
EP-376/2009 |
13 Nov 2010 |
Valid |
Further Environmental Permit |
FEP-01/356/2009 |
18 Feb
2010 |
Valid |
Further Environmental Permit |
FEP-02/356/2009 |
24 Mar
2010 |
Valid |
Further Environmental Permit |
FEP-03/356/2009 |
24 Mar
2010 |
Valid |
Further
Environmental Permit |
24 Mar
2010 |
Valid |
|
Further
Environmental Permit |
21 Apr 2010 |
Valid |
|
Further
Environmental Permit |
12 July 2010 |
Valid |
3.1.2.
Due to the multi-contract nature of the Project, the
status of permits and/or licences under the individual contract(s) are
presented as below:
Contract no. HY/2009/11  Central  Wanchai
Bypass, North Point Reclamation
3.1.3.
Summary
of the current status on licences and/or permits on environmental protection
pertinent and
submission under FEP-01/356/2009 for
contract no. HY/2009/11
are shown in Table 3.2 and
Table 3.3.
Table
3.2  Cumulative Summary of Valid
Licences and Permits under Contract no. HY/2009/11
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/ Expiry
Date |
Status |
Further Environmental Permit |
FEP-01/356/2009 |
18 Feb 2010 |
N/A |
Valid |
Notification of Works Under APCO |
314911 |
9 Mar 2010 |
N/A |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0371-10<
cite="mailto:Lam20100204" datetime="2010-09-07T15:01">GW-RS0119-10> |
7 May 2010<
cite="mailto:Lam20100204" datetime="2010-09-07T15:01">17 Feb 2010> |
10 May 2010 to 31 Oct 2010< cite="mailto:Lam20100204" datetime="2010-09-07T15:01">22>< cite="mailto:Lam20100204" datetime="2010-09-07T15:01"> Feb >< cite="mailto:Lam20100204" datetime="2010-09-07T15:01">2010>< cite="mailto:Lam20100204" datetime="2010-09-07T15:01"> to><
cite="mailto:Lam20100204" datetime="2010-09-07T15:01"> >< cite="mailto:Lam20100204"
datetime="2010-09-07T15:01">22 Aug 2010> |
Valid <
cite="mailto:Lam20100204" datetime="2010-09-07T15:01">Superseded> |
GW-RS0534-10 |
22 Jun 2010 |
29 Jun 2010 to 28 Dec 2010 |
Valid <
cite="mailto:Lam20100204" datetime="2010-09-07T15:01">(Replaced CNP no.
GW-RS0437-10)> |
|
Billing Account
under Waste Disposal Ordinance |
7010037 |
13 Jan 2010 |
N/A |
Valid |
Dumping Permit (Type 1  Open
Sea Disposal) |
EP/MD/10-067 |
10 Mar 2010 |
10 Mar 2010 to 9 Sep 2010 |
Valid |
Dumping Permit (Type 1  Open Sea Disposal
(Dedicate Sites) & Type 2  Confined Marine Disposal) |
EP/MD/11-033 |
9 Jul 2010 |
10
Jul to 9 Aug 2010 |
Expired |
EP/MD/11-044 |
2 Aug 2010 |
10
Aug to 9 Sep 2010 |
Valid |
Table 3.3  Summary
of submission status under FEP-01/356/2009 Condition
EP Condition |
Submission |
Date of Submission |
Condition 2.6 |
Management Organization of Main
Construction Companies |
18 Dec 2009 |
Condition 2.7 |
Submission of works schedule and location plan |
8 Feb 2010 |
Condition
2.8 |
Silt
Curtain Deployment Plan |
25 Feb 2010 |
Condition
2.9 |
Silt
Screen Deployment Plan |
25 Feb 2010 |
Condition
2.10 |
Coral
Translocation Plan |
20 Nov 2009 |
Condition
2.16 |
Noise
Management Plan |
1 Mar 2010 |
Condition
2.17 |
Landscape
Plan |
12
May 2010 |
|
Submission of
Supplementary Information - Revised Management & Maintenance Schedule for
Submitted Revised Landscape Plan |
25 Aug 2010 |
Contract no. HK/2009/01 - Wan
Chai Development Phase II  Central –Wanchai Bypass at HKCEC
3.1.4.
Summary
of the current status on licences and/or permits on environmental protection
pertinent and
submission under FEP-02/356/2009 for
contract no.
HK/2009/01 are shown in Table 3.4 and
Table 3.5.
Table 3.4  Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2009/01
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/ Expiry
Date |
Status |
Further Environmental Permit |
FEP-02/356/2009 |
24 Mar 2010 |
N/A |
Valid |
Further Environmental Permit |
FEP-02/364/2009 |
21 Apr 2010 |
N/A |
Valid |
Notification of Works Under APCO |
313088 |
6 Jan 2010 |
N/A |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0313-10 |
16 Apr 2010 |
16 Apr 2010 to 14 Sep 2010 |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0328-10 |
22 Apr 2010 |
22 Apr 2010 to 15 Oct 2010 |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0333-10 |
21 Apr 2010 |
21 Apr 2010 to 14 Sep 2010 |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0336-10 |
21 Apr 2010 |
21 Apr 2010 to 14 Sep 2010 |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment |
GW-RS0554-10 |
25 Jun 2010 |
28 Jun 2010 to 30 Sep 2010 |
Valid |
Discharge Licence |
WT00006220-2010 |
18 Mar 2010 |
31 Mar <
cite="mailto:mansonyeung" datetime="2010-09-06T17:41">31 Mar 2015><
cite="mailto:Lam20100204" datetime="2010-09-07T15:17">N/A>2015 |
Valid |
Registration as a Waste Producer |
7010069 |
21 Jan 2010 |
N/A |
Valid |
Registration as a Chemical Waste Producer |
WPN5213-134-C3585-01 |
21 Jan 2010 |
N/A |
Valid |
Dumping Permit (Type 1  Open
Sea Disposal) |
EP/MD/10-060 |
30 Apr 2010 |
4 May to 3 Nov 2010 |
Valid |
Dumping Permit (Type 1  Open Sea Disposal
(Dedicate Sites) & Type 2  Confined Marine Disposal) |
EP/MD/11-027 |
29 Jun 2010 |
1 Jul to 31 Jul 2010 |
Expired |
EP/MD/11-041 |
31 Aug 2010 |
1 Sep to 30 Sep 2010 |
Valid |
Table 3.5  Summary
of submission status under FEP-02/356/2009 Condition
EP Condition |
Submission |
Date of Submission |
Condition 2.6 |
Management Organization of Main
Construction Companies |
13 Apr 2010 |
Condition 2.7 |
Works Schedule and Location
Plan |
8 Apr 2010 |
Condition 2.8 |
Silt Curtain Deployment Plan |
19 Apr 2010 |
Condition 2.9 |
Silt Screen Deployment Plan |
19 Apr 2010 |
Conditions 2.8 and 2.9 |
Supplementary Document on Silt Curtain and Silt
Screen Deployment Plan |
19 Jul 2010 |
Report on Field Testing for Silt Curtain |
26 Aug 2010 |
|
Condition 2.17 |
Noise Management Plan |
23 Apr 2010 |
Condition 2.18 |
Landscape Plan (Erection of
Decorative Screen Hoarding along Construction Site around Hong Kong
Exhibition and Convention Centre) |
15 May 2010 |
Contract no. HK/2009/02 - Wan
Chai Development Phase II  Central  Wan Chai Bypass at WanChai East
3.1.5.
Summary
of the current status on licences and/or permits on environmental protection
pertinent and
submission under FEP-03/356/2009 for
contract no.
HK/2009/02 are shown in Table 3.6 and
Table 3.7.
Table 3.6  Cumulative
Summary of Valid Licences and Permits under Contract no. HK/2009/02
Permits and/or Licences |
Reference No. |
Issued Date |
Valid Period/ Expiry
Date |
Status |
Further Environmental Permit |
FEP-03/356/2009 |
24 Mar 2010 |
N/A |
Valid |
FEP-01/364/2009 |
24 Mar 2010 |
N/A |
Valid |
|
Notification of Works Under APCO |
313962 |
2 Feb 2010 |
N/A |
Valid |
Construction Noise Permit (CNP) for piling equipment |
PP-RS0016-10 |
14 Apr 2010 |
1 Jun 2010 to 31< cite="mailto:mansonyeung" datetime="2010-09-06T17:43">0> Nov 2010 |
Valid |
Construction Noise Permit (CNP)
for non-piling equipment< cite="mailto:Lam20100204"
datetime="2010-09-07T15:23"> <
cite="mailto:Lam20100204" datetime="2010-09-03T17:10">Construction Noise
Permit (CNP) for non-piling equipment><
cite="mailto:Lam20100204" datetime="2010-09-07T15:23"> <
cite="mailto:Lam20100204" datetime="2010-09-03T17:10">Construction Noise
Permit (CNP) for non-piling equipment> |
GW-RS0132-10 |
22 Feb 2010 |
01 Apr to 30 Sep 2010 |
Valid |
GW-RS0325-10 |
16 Apr 2010 |
30 Apr to 31 Jul 2010 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T15:23">Valid>Expired |
|
GW-RS0327-10 |
16 Apr 2010 |
30 Apr to 30 Sep 2010 |
Valid |
|
GW-RS0653-10 |
30 July 2010 |
1 Aug 2010 to 31< cite="mailto:Lam20100204" datetime="2010-09-08T19:09">/01/> Jan 2011 |
Valid |
|
Discharge Licence |
WT00006249-2010 |
22 Mar 2010 |
31
Mar 2015 |
Valid |
WT00006436-2010 |
15 Apr 2010 |
30
Apr 2015 |
Valid |
|
WT00006673-2010 |
14 May 2010 |
31
Mar 2015 |
Valid |
|
WT00006757-2010 |
28 May 2010 |
31 May 2015 |
Valid |
|
WT00007129-2010 |
28 July 2010 |
< cite="mailto:Lam20100204"
datetime="2010-09-07T15:25">N/A>31 Jul 2015 |
Valid |
|
Billing Account
under Waste Disposal Ordinance |
7010255 |
10 Feb 2010 |
N/A |
Valid |
Registration as Chemical Waste
Producer |
WPN5213-135-C3593-01 |
10 Mar 2010 |
N/A |
Valid |
Dumping Permit (Type 1  Open
Sea Disposal) |
EP/MD/10-069 |
6 May 2010 |
6 May
to 5 Nov 2010 |
Valid |
Dumping Permit (Type 1  Open
Sea Disposal (Dedicate Sites) & Type 2  Confined Marine disposal) |
EP/MD/11-035< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">EP/MD/10-070> |
6 July 2010< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">6 May
2010> |
6 July to 5 Aug 2010< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">6 May
2010 ><
cite="mailto:Lam20100204" datetime="2010-09-07T15:26"> />< cite="mailto:Lam20100204"
datetime="2010-09-07T15:26"> 5 >< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">June
2010> |
Expired<
cite="mailto:Lam20100204" datetime="2010-09-07T15:26">Expired> |
EP/MD/11-043< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">EP/MD/11-013> |
28 July 2010< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">4
June 2010> |
6 Aug - 5 Sept 2010< cite="mailto:Lam20100204"
datetime="2010-09-07T15:26">6 June 2010 - 5 July 2010> |
Valid< cite="mailto:Lam20100204"
datetime="2010-09-07T15:26">Expired> |
|
EP/MD/11-059 |
24 Aug 2010 |
6 Sept 2010-
5 Oct 2010 |
Valid< cite="mailto:Lam20100204" datetime="2010-09-07T15:26">Valid> |
Table 3.7  Summary
of submission status under FEP-03/356/2009 Condition
EP Condition |
Submission |
Date of Submission |
<
cite="mailto:Lam20100204" datetime="2010-09-07T15:27">C><
cite="mailto:Lam20100204" datetime="2010-09-07T15:27">lause >Condition 2.5 |
Commencement Date of Construction of Marine Works |
8 April 2010 |
Condition 2.6 |
Management Organization of Main
Construction Companies |
10 April 2010 |
Condition 2.7 |
Works Schedule and Location
Plans |
8 April 2010 |
25 May 2010 |
||
Condition 2.8 |
Silt Curtain Deployment Plan |
20 April 2010 |
25 May 2010 |
||
14 June 2010 |
||
Condition 2.9 |
Silt Screen Deployment Plan |
21 April 2010 |
Condition 2.17 |
Noise Management Plan |
6 May 2010 |
Condition 2.18 |
Landscape Plan (Decorative
Screen Hoarding) |
11 May 2010 |
Landscape Plan (Control of
Night-time Lighting) |
2 June 2010 |
3.1.6.
Implementation status of the recommended mitigation
measures during this reporting period is presented in Appendix 3.1.
Noise Monitoring Stations
4.1.1.
The noise monitoring stations for the Project are
listed and shown in Table 4.1 and Figure 4.1.  /span>Appendix 4.1 shows the established Action/Limit
Levels for the monitoring works.
Table
4.1  Noise Monitoring Station
Station |
Description |
M1a |
Harbour
Road Sports Centre |
M2b |
Noon Gun Area |
M3a |
Tung Lo Wan Fire Station |
<
cite="mailto:mansonyeung" datetime="2010-09-02T19:36">M4a>M4b |
< cite="mailto:mansonyeung" datetime="2010-09-02T19:36">Causeway
Bay Community Centre>Victoria Centre |
M5b |
City
Garden |
M6 |
HK Baptist Church Henrietta
Secondary School |
<
cite="mailto:Lam20100204" datetime="2010-09-07T15:28"> >< cite="mailto:Lam20100204" datetime="2010-09-07T15:28">
< cite="mailto:Lam20100204" datetime="2010-09-07T15:28">4.1.1.>< cite="mailto:mansonyeung"
datetime="2010-09-02T19:37">Reviewed the past monitoring results and
observation at Station M4a, the monitoring location at Causeway Bay Community
Centre is facing and closed to the Island Eastern Corridor. Traffic noise is
the major noise source obtained in the monitoring that >< cite="mailto:mansonyeung" datetime="2010-09-02T19:37">cannot>< cite="mailto:mansonyeung" datetime="2010-09-02T19:37"> be >< cite="mailto:mansonyeung" datetime="2010-09-02T19:37">reflected>< cite="mailto:mansonyeung" datetime="2010-09-02T19:37"> the
fact of the construction noise from the construction site>< cite="mailto:Lam20100204" datetime="2010-09-07T15:28">.
Victoria Centre (Station ID: M4b) is proposed as alternative noise monitoring >< cite="mailto:Lam20100204" datetime="2010-09-07T15:28">station,
which>< cite="mailto:Lam20100204"
datetime="2010-09-07T15:28"> is more ><
cite="mailto:Lam20100204" datetime="2010-09-07T15:28">appropriate>< cite="mailto:Lam20100204" datetime="2010-09-07T15:28"> and
representative as noise monitoring station for monitoring the construction
noise arising from the near construction site.><
cite="mailto:Lam20100204" datetime="2010-09-07T15:28">
Noise Monitoring Parameters, Frequency
and Duration
4.1.2.
The construction noise level shall
be measured in terms of the A-weighted equivalent continuous sound
pressure level (Leq). Leq (30 minutes) shall be used as
the monitoring parameter for the time period between 0700
and 1900 hours on normal weekdays. For all other time periods, Leq (5
minutes) shall be employed for comparison with the Noise Control
Ordinance (NCO) criteria. Supplementary information for
data auditing, statistical results such as L10 and L90 shall also be obtained
for reference.
4.1.3.
Noise monitoring shall be carried out at all
the designated monitoring stations. The monitoring frequency shall depend on
the scale of the construction activities. The following is an initial guide on
the regular monitoring frequency for each station on a weekly basis when noise
generating activities are underway:
 -
one set of measurements between 0700 and 1900
hours on normal weekdays.
4.1.4.
If construction works are extended to include
works during the hours of 1900  0700 as well as public holidays and Sundays,
additional weekly impact monitoring shall be carried out during respective
restricted hours periods. Applicable permits under NCO shall be obtained by the
Contractor.
Monitoring Equipment
4.1.5.
As referred to in the Technical Memorandum  
issued under the NCO, sound level meters in compliance with the International
Electrotechnical Commission Publications 651: 1979 (Type 1) and 804: 1985 (Type
1) specifications shall be used for carrying out the noise monitoring.
Immediately prior to and following each noise measurement the accuracy of the
sound level meter shall be checked using an acoustic calibrator generating a
known sound pressure level at a known frequency. Measurements may be accepted
as valid only if the calibration level from before and after the noise
measurement agree to within 1.0 dB.
4.1.6.
Noise measurements shall not be made in fog,
rain, wind with a steady speed exceeding 5 m/s or wind with gusts exceeding 10
m/s. The wind speed shall be checked with a portable wind speed meter capable
of measuring the wind speed in m/s.
4.1.7.
The sound level meter shall be checked using
an acoustic calibrator generating a known sound pressure level at a known
frequency before deployment to the site and during each site visit.
Measurements may be accepted as valid only if the calibration level from before
and after the noise measurement agree to within 1.0 dB.
Air Quality Monitoring Stations
4.2.1.
The air monitoring stations for the Project
are listed and shown in Table 4.2 and Figure 4.1. Appendix 4.1 shows the established
Action/Limit Levels for the monitoring works.
Table 4.2  Air Monitoring Station
Station ID |
Monitoring Location |
Description |
CMA1b |
Oil Street Community Liaison Centre |
North
Point |
CMA2a |
Causeway Bay Community Centre |
Causeway
Bay |
CMA3a |
Future CWB site office at Wanchai
Waterfront Promenade |
Causeway
Bay |
CMA4a |
Society for the Prevention of
Cruelty to Animals |
Wan Chai |
CMA5a |
Children Playgrounds opposite to
Pedestrian Plaza |
Wan Chai |
CMA6a |
Future AECOM site office at Work
Area |
Wan Chai |
Air Monitoring Parameters, Frequency and
Duration
4.2.2.
One-hour and 24-hour TSP levels should be
measured to indicate the impacts of construction dust on air quality. The
24-hour TSP levels shall be measured by following the standard high volume
sampling method as set out in the Title 40 of the Code of Federal Regulations,
Chapter 1 (Part 50), Appendix B.
4.2.3.
All relevant data including temperature,
pressure, weather conditions, elapsed-time meter reading for the start and stop
of the sampler, identification and weight of the filter paper, and any other
local atmospheric factors affecting or affected by site conditions, etc., shall
be recorded down in detail.
4.2.4.
For regular impact monitoring, the sampling
frequency of at least once in every six-days, shall be strictly observed at all
the monitoring stations for 24-hour TSP monitoring. For 1-hour TSP monitoring,
the sampling frequency of at least three times in every six-days should be
undertaken when the highest dust impact occurs.
Sampling Procedure and Monitoring
Equipment
4.2.5.
High volume samplers (HVSs) in compliance
with the following specifications shall be used for carrying out the 1-hour and
24-hour TSP monitoring:
 -
0.6 - 1.7 m3 per minute adjustable flow
range;
 -
equipped with a timing / control device with
+/- 5 minutes accuracy for 24 hours operation;
 -
installed with elapsed-time meter with +/- 2
minutes accuracy for 24 hours operation;
 -
capable of providing a minimum exposed area
of 406 cm2;
 -
flow control accuracy: +/- 2.5% deviation
over 24-hour sampling period;
 -
equipped with a shelter to protect the filter
and sampler;
 -
incorporated with an electronic mass flow
rate controller or other equivalent devices;
 -
equipped with a flow recorder for continuous
monitoring;
 -
provided with a peaked roof inlet;
 -
incorporated with a manometer;
 -
able to hold and seal the filter paper to the
sampler housing at horizontal position;
 -
easily changeable filter; and
 -
capable of operating continuously for a
24-hour period.
4.2.6.
Initial calibration of dust monitoring
equipment shall be conducted upon installation and thereafter at bi-monthly
intervals. The transfer standard shall be traceable to the internationally
recognized primary standard and be calibrated annually. The concern parties
such as IEC shall properly document the calibration data for future reference.
All the data should be converted into standard temperature and pressure
condition.
Laboratory Measurement / Analysis
4.2.7.
A clean laboratory with constant temperature
and humidity control, and equipped with necessary measuring and conditioning
instruments to handle the dust samples collected, shall be available for sample
analysis, and equipment calibration and maintenance. The laboratory should be
HOKLAS accredited.
4.2.8.
Filter paper of size 8" x 10" shall
be labeled before sampling. It shall be a clean filter paper with no pinholes,
and shall be conditioned in a humidity-controlled chamber for over 24-hours and
be pre-weighed before use for the sampling.
4.2.9.
After sampling, the filter paper loaded with
dust shall be kept in a clean and tightly sealed plastic bag. The filter paper
shall then be returned to the laboratory for reconditioning in the humidity
controlled chamber followed by accurate weighing by an electronic balance with
readout down to 0.1 mg. The balance shall be regularly calibrated against a
traceable standard.
4.2.10. All
the collected samples shall be kept in a good condition for 6 months before
disposal.
4.3.1.
The EIA Report has identified that the key
water quality impact would be associated with the dredging works during the
construction phase. Marine water
quality monitoring for dissolved oxygen (DO), suspended solid (SS) and
turbidity is therefore recommended to be carried out at selected WSD flushing
water intakes. The impact monitoring
should be carried out during the proposed dredging works to ensure the
compliance with the water quality standards.
Water Quality Monitoring Stations
4.3.2.
It is proposed to monitor the water quality
at 9 WSD salt water intakes and 12 cooling water intakes along the seafront of
the Victoria Harbour. The proposed water quality monitoring stations of the
Project are shown in Table 4.3 and Figure 4.1. Appendix 4.1 shows the established
Action/Limit Levels for the monitoring works.
Table
4.3   Marine Water Quality Stations for
Water Quality Monitoring
Station Ref. |
Location |
Easting |
Northing |
WSD Salt
Water Intake |
|||
WSD7 |
Kowloon South |
834150.0 |
818300.3 |
WSD9 |
Tai Wan |
837921.0 |
818330.0 |
WSD10 |
Cha Kwo Ling |
841900.9 |
817700.1 |
WSD15 |
Sai Wan Ho |
841110.4 |
816450.1 |
WSD17 |
Quarry Bay |
839790.3 |
817032.2 |
WSD19 |
Sheung Wan |
833415.0 |
816771.0 |
WSD20 |
Kennedy Town |
830750.6 |
816030.3 |
WSD21 |
Wan Chai |
836220.8 |
815940.1 |
RW1 |
Wan Chai (Reprovision) |
836188.8 |
815911.1 |
Cooling
Water Intake |
|||
C1 |
HKCEC Extension |
835885.6 |
816223.0 |
C2 |
Telecom House |
835647.9 |
815864.4 |
C3 |
HKCEC Phase I |
835836.2 |
815910.0 |
C4e |
Wan Chai Tower and Great Eagle
Centre (Eastern) |
835932.8 |
815888.2 |
C4w |
Wan Chai Tower and Great Eagle
Centre (Western) |
835629.8 |
815889.2 |
C5e |
Sun Hung Kai Centre (Eastern) |
836250.1 |
815932.2 |
C5w |
Sun Hung Kai Centre (Western) |
836248.1 |
815933.2 |
C6 |
World Trade Centre |
837009.6 |
815999.3 |
C7 |
Windsor House |
837193.7 |
816150.0 |
C8 |
City Garden |
837970.6 |
816957.3 |
C9 |
Provident Garden |
838355.0 |
817116.6 |
RC1 |
Proposed
HKAPA Extension |
835487.7 |
815987.7 |
RC5 |
Sun Hung
Kai Centre (Reprovision) |
836291.4 |
816029.7 |
RC7 |
Windsor House (Temporary Dilution) |
837245.2 |
816156.6 |
Water Quality Parameters
4.3.3.
Monitoring of dissolved oxygen (DO),
turbidity and suspended solids (SS) shall be carried out at WSD flushing water
intakes and cooling water intakes. DO and Turbidity are measured in-situ while
SS is determined in laboratory. 
4.3.4.
In association with the water quality
parameters, other relevant data shall also be measured, such as monitoring
location/position, time, sampling depth, water temperature, pH, salinity,
dissolved oxygen (DO) saturation, weather conditions, sea conditions, tidal
stage, and any special phenomena and work underway at the construction site
etc.
Sampling Procedures and Monitoring
Equipment
4.3.5.
The interval between two sets of monitoring
should not be less than 36 hours except where there are exceedances of Action
and/or Limit Levels, in which case the monitoring frequency will be
increased. Table 4.4 shows the
proposed monitoring frequency and water quality parameters. Duplicate in-situ measurements and water
sampling should be carried out in each sampling event. For selection of tides for in-situ
measurement and water sampling, tidal range of individual flood and ebb tides
should be not less than 0.5m.
Table
4.4  Marine Water Quality Monitoring
Frequency and Parameters
Activities |
Monitoring Frequency1 |
Parameters2 |
During the 4-week baseline
monitoring period |
Three days per week, at mid-flood
and mid-ebb tides |
Turbidity, Suspended Solids (SS),
Dissolved Oxygen (DO), pH, Temperature, Salinity |
During marine
construction works |
Three days per week, at mid-flood
and mid-ebb tides |
Turbidity, Suspended Solids (SS),
Dissolved Oxygen (DO), pH, Temperature, Salinity |
After
completion of marine construction works |
Three days per week, at mid-flood
and mid-ebb tides |
Turbidity, Suspended Solids (SS),
Dissolved Oxygen (DO), pH, Temperature, Salinity |
Notes:
1. For
selection of tides for in-situ measurement and water sampling, tidal range of
individual flood and ebb tides should be not less than 0.5m.
2. Turbidity
should be measured in situ whereas SS should be determined by laboratory.
Dissolved Oxygen and Temperature
Measuring Equipment
4.3.6.
The instrument should be a portable,
weatherproof dissolved oxygen measuring instrument complete with cable, sensor,
comprehensive operation manuals, and use a DC power source. It should be capable of measuring:
 -
a dissolved oxygen level in the range of 0-20
mg/l and 0-200% saturation
 -
a temperature of 0-45 degree Celsius
4.3.7.
It should have a membrane electrode with
automatic temperature compensation complete with a cable. Sufficient stocks of spare electrodes and cables
should be available for replacement where necessary. (e.g. YSI mo 59 meter,
YSI 5739 probe, YSI 5795A submersible stirrer with reel and cable or an
approved similar instrument).
4.3.8.
Should salinity compensation not be build-in
in the DO equipment, in-situ salinity shall be measured to calibrate the DO
equipment prior to each DO measurement.
Turbidity Measurement Instrument
4.3.9.
The instrument should be a portable,
weatherproof turbidity-measuring instrument complete with comprehensive
operation manual. The equipment should
use a DC power source. It should have a
photoelectric sensor capable of measuring turbidity between 0‑1000 NTU
and be complete with a cable (e.g. Hach mo 2100P or an approved similar
instrument).
Sampler
4.3.10. A
water sampler comprises a transparent PVC cylinder, with a capacity of not less
than 2 litres, and can be effectively sealed with latex cups at both ends. The sampler should have a positive latching
system to keep it open and prevent premature closure until released by a
messenger when the sampler is at the selected water depth (e.g. Kahlsico Water
Sampler or an approved similar instrument).
Sample Container and Storage
4.3.11. Water
samples for suspended solids measurement should be collected in high-density
polythene bottles, packed in ice (cooled to 4°C without being frozen), and
ivered to ALS Technichem (HK) Pty Ltd. as soon as possible after collection
for analysis.
Water Depth Detector
4.3.12. A
portable, battery-operated echo sounder shall be used for the determination of
water depth at each designated monitoring station. This unit can either be handheld or affixed to the bottom of the
workboat, if the same vessel is to be used throughout the monitoring
programme. 
Salinity
4.3.13. A
portable salinometer capable of measuring salinity in the range of 0-40 ppt
shall be provided for measuring salinity of the water at each of monitoring
location.
Monitoring Position Equipment
4.3.14. A
hand-held or boat-fixed type digital Global Positioning System (GPS) with way
point bearing indication or other equivalent instrument of similar accuracy
shall be provided and used during monitoring to ensure the monitoring vessel is
at the correct location before taking measurements.
Calibration of In-situ Instruments
4.3.15. All
in-situ monitoring instrument shall be checked, calibrated and certified by a
laboratory accredited under HOKLAS or equivalent before use, and subsequently
re-calibrated at 3 monthly intervals throughout all stages of the water quality
monitoring. Responses of sensors and electrodes should be checked with certified
standard solutions before each use. Wet
bulb calibration for a DO meter shall be carried out before measurement at each
monitoring location.
4.3.16. For
the on site calibration of field equipment by the ET, the BS 127:1993,
"Guide to Field and on-site test methods for the analysis of waters"
should be observed.
4.3.17. Sufficient
stocks of spare parts should be maintained for replacements when
necessary. Backup monitoring equipment
shall also be made available so that monitoring can proceed uninterrupted even
when some equipment is under maintenance, calibration, etc.
4.3.18. Current
calibration certificates of equipments are presented in Appendix
4.2.
Laboratory Measurement / Analysis
4.3.19. Analysis
of suspended solids has been carried out in a HOKLAS accredited laboratory, ALS
Technichem (HK) Pty Ltd. Water samples
of about 1L shall be collected at the monitoring stations for carrying out the
laboratory SS determination. The SS
determination work shall start within 24 hours after collection of the water
samples. The SS determination shall
follow APHA 19ed or equivalent methods subject to the approval of IEC and EPD.
5.0.1.
The environmental monitoring will be
implemented based on the division of works areas of each designed project
managed under different contracts with separate FEP applied by individual
contractors. Overall layout showing
work areas of various contracts, latest status of work commencement and monitoring
stations is shown in Figure
2.1 and Figure 4.1. The monitoring results
are presented in according to the Individual Contract(s).
5.0.2.
In the reporting month, the concurrent
contracts are as follows:
Contract no. HY/2009/11 Central - Wan Chai
Bypass - North Point Reclamation;
Contract no. HK/2009/01  Wan Chai Development
Phase II  Central-Wan Chai Bypass at Hong Kong Convention and Exhibition
Centre; and
Contract no. HK/2009/02 Wan Chai Development
Phase II  Central-Wan Chai Bypass at Wan Chai East
5.0.3.
The environment monitoring schedules for
reporting month and coming month are presented in Appendix
5.1.
Contract
no. HY/2009/11  Central  Wanchai Bypass, North Point Reclamation
5.1.1.
The proposed division of noise monitoring
stations for Contract no. HY/2009/11 are summarized in Table 5.1 below:
Table 5.1   Noise Monitoring Stations for Contract no.  /span>HY/2009/11
Station |
Description |
M4b< cite="mailto:Lam20100204" datetime="2010-09-07T15:29">a> |
< cite="mailto:Lam20100204"
datetime="2010-09-07T15:29">Causeway Bay Community Centre>Victoria Centre |
M5b |
City Garden |
5.1.2.
Day time and evening period noise monitoring
was conducted at the City Garden and <
cite="mailto:Lam20100204" datetime="2010-09-07T15:29">Causeway Bay Community>Victoria Centre in
the reporting month.
5.1.3.
Noise monitoring results measured in this
reporting period are reviewed and summarized. 
Two action
level exceedances were recorded due to the receipt of noise complaints dated 31 July and 12 August 2010 regarding the noise nuisance generated from the dredging works at North Point. Details of noise
monitoring results and graphical presentation can be referred in Appendix 5.2. 
< cite="mailto:Lam20100204"
datetime="2010-09-07T15:30">5.1.1.>< cite="mailto:Lam20100204"
datetime="2010-09-07T15:30">Two limit level exceedances were recorded at M4a on
20 and 27 July 2010 during restricted hours. The traffic noise from Island
Eastern Corridor was the major noise source contributed in the exceeded noise
levels. >< cite="mailto:Lam20100204"
datetime="2010-09-07T15:30">The work undertaken><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30"> >< cite="mailto:Lam20100204" datetime="2010-09-07T15:30">was
complied with the conditions under valid Construction Noise Permit no.
GW-RS0371-10 during the measurement><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30">. At such, it was
considered as not project related exceedances.><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30">
<
cite="mailto:Lam20100204" datetime="2010-09-07T15:30">Reviewed the past
monitoring results and observation at Station M4a, the monitoring location at
Causeway Bay Community Centre is facing and closed to the Island Eastern
Corridor. Traffic noise is the major noise source obtained in the monitoring
that >< cite="mailto:Lam20100204"
datetime="2010-09-07T15:30">cannot><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30"> be >< cite="mailto:Lam20100204" datetime="2010-09-07T15:30">reflected>< cite="mailto:Lam20100204" datetime="2010-09-07T15:30"> the
fact of the construction noise from the construction site. Victoria Centre
(Station ID: M4b) is proposed as alternativ>< cite="mailto:Lam20100204"
datetime="2010-09-07T15:30">e noise monitoring ><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30">station>< cite="mailto:Lam20100204" datetime="2010-09-07T15:30"> from
August 2010.><
cite="mailto:Lam20100204" datetime="2010-09-07T15:30">
Contract
no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai Bypass at
HKCEC and Contract no. HK/2009/02 - Wan Chai Development Phase II  Central  
Wan Chai Bypass at WanChai East
5.1.4.
<
cite="mailto:Lam20100204" datetime="2010-09-08T11:04">The commencement of
marine construction works for Contract no. HK/2009/01 and HK/2009/02 were
commenced in July 2010. >The proposed division of noise monitoring
stations are summarized in Table 5.2 below.
Table 5.2
  Noise Monitoring Station for Contract nos. HK/2009/01 and HK/2009/02
Station |
Description |
M1a |
Harbour Road Sports Centre |
5.1.5.
<
cite="mailto:Lam20100204" datetime="2010-09-08T11:04">Day time>Daytime and evening
period noise monitoring was conducted at the Harbour Road Sport Centre in the
reporting month. < cite="mailto:Lam20100204"
datetime="2010-09-07T15:31">Due to the marine works undertaken in evening time
from 12 July 2010, noise monitoring during evening time was conducted from 13
July 2010. >
5.1.6.
Three limit level
exceedances were recorded on 3, 10 and 17 August 2010 during construction
works at evening time for Contract no. HK/<
cite="mailto:Lam20100204" datetime="2010-09-09T09:53"> >2009/02 in
reporting month. Major noise source was contributed from Tonnochy Road and
water sport competition at Wan Chai Training Swimming Pool. The dredging work was
complied with the conditions under valid Construction Noise Permit no.
GW-RS0132-10 during the measurement. < cite="mailto:Lam20100204" datetime="2010-09-07T15:31">It is
concluded as not related to the Project works. However, baseline noise level at
M1 is 60.1 dB(A) which is needed to be reviewed.>
Contract
no. HY/2009/11  Central  Wanchai Bypass, North Point Reclamation
< cite="mailto:Lam20100204" datetime="2010-09-07T15:33">5.2.1.
>The major construction activities
of Contract no. HY/2009/11 < cite="mailto:Lam20100204"
datetime="2010-09-07T15:32">was >were dredging works and filling works in
the reporting month. < cite="mailto:Lam20100204"
datetime="2010-09-07T15:33">No major dust impact is anticipated to be caused by
the dredging works. Therefore, no air monitoring was conducted in the reporting
month. >< cite="mailto:Lam20100204"
datetime="2010-09-07T15:33">
5.2.1.
Since the filling work was commenced in mid-August 2010, <
cite="mailto:Lam20100204" datetime="2010-09-07T15:33">A>air monitoring < cite="mailto:Lam20100204" datetime="2010-09-07T15:33">will be>had been commenced < cite="mailto:Lam20100204" datetime="2010-09-07T15:34">from
the filling work for Contract no. HY/2009/11>on 11 August 2010. The
proposed division of air monitoring stations are summarized in Table
5.3 below.
Table 5.3
  Air
Monitoring Stations for Contract no. HY/2009/11
Station |
Description |
CMA1b |
Oil Street Community Liaison Centre |
CMA2a |
Causeway Bay Community Centre |
5.2.2.
Due to no 24-hour electricity supply in CMA1b  /ins> Oil Street Community Liaison
Centre, only 1-hour TSP monitoring can be conducted in the reporting month. Details of noise
monitoring results and graphical presentation can be referred in Appendix
5.3. 
5.2.3.
One limit level exceedance was recorded at CMA1b on
24 August 2010. Investigation
found that the
exceedance was not
related to the construction activities. The details can be referred to Section
6.0.
< cite="mailto:Lam20100204"
datetime="2010-09-07T15:37"> ><
cite="mailto:Lam20100204" datetime="2010-09-07T15:37">
Contract
no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai Bypass at
HKCEC
5.2.4.
Air monitoring will be commenced from the
filling work for Contract no. HK/2009/01. The proposed division of air
monitoring stations are summarized in Table 5.4 below.
Table 5.4
  Air
Monitoring Stations
for Contract
no. HK/2009/01
Station |
Description |
CMA5a |
Children Playgrounds opposite to Pedestrian Plaza |
CMA6a |
Future AECOM site office at Work Area 1 |
Contract
no. HK/2009/02 - Wan Chai Development Phase II  Central  Wan Chai Bypass at
WanChai East
5.2.5.
Air monitoring will be commenced from the
filling work for Contract no. HK/2009/02. The proposed division of air
monitoring stations are summarized in Table 5.5 below.
Table 5.5
  Air
Monitoring Station for Contract no. HK/2009/02
Station |
Description |
CMA4a |
Society for the Prevention of Cruelty to Animals |
Contract
no. HY/2009/11  Central  Wanchai Bypass, North Point Reclamation
5.3.1.
The proposed division of water monitoring
stations for Contract no. HY/2009/11 are summarized in Table 5.6 below:
Table 5.6
  Water Monitoring Stations for Contract no.  /span>HY/2009/11
Station Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD9 |
Tai Wan |
837921.0 |
818330.0 |
WSD10 |
Cha Kwo Ling |
841900.9 |
817700.1 |
WSD15 |
Sai Wan Ho |
841110.4 |
816450.1 |
WSD17 |
Quarry Bay |
839790.3 |
817032.2 |
Cooling Water Intake |
|||
C8 |
City Garden |
837970.6 |
816957.3 |
C9 |
Provident Garden |
838355.0 |
817116.6 |
Contract
no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai Bypass at
HKCEC
5.3.2.
Due to the
commencement of dredging work for Contact
no. HK/2009/02, water
monitoring
stations for Contract no. HK/2009/01 were commenced on 8 July 2010. Installations
of silt screen and silt curtain were completed in the reporting month. The
proposed division of water monitoring stations are summarized in Table
5.7 below.
Table 5.7
  Water Monitoring Stations for Contract no. HK/2009/01
Station Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD7 |
Kowloon South |
834150.0 |
818300.3 |
WSD19 |
Sheung Wan |
833415.0 |
816771.0 |
WSD20 |
Kennedy Town |
830750.6 |
816030.3 |
Cooling Water Intake |
|||
C1 |
HKCEC Extension |
835885.6 |
816223.0 |
C2 |
Telecom House |
835647.9 |
815864.4 |
C3 |
HKCEC Phase I |
835836.2 |
815910.0 |
C4e |
Wan Chai Tower and Great
Eagle Centre (Eastern) |
835932.8 |
815888.2 |
C4w |
Wan Chai Tower and Great
Eagle Centre (Western) |
835629.8 |
815889.2 |
Remarks:
The water monitoring stations for
the dredging works under Contract No. HK/2009/01 should also include WSD9,
WSD17, WSD 21 and C5 if water quality monitoring at these locations have not
been carried out by others. Similarly, the water monitoring stations for the
dredging works under Contract No. HK/2009/02 should also include WSD7, WSD9,
WSD17, WSD 19, C1, C2, C3 and C4 if water quality monitoring at these locations
have not been carried out by others.
Contract
no. HK/2009/02 - Wan Chai Development Wan Chai Development Phase II  Central  
Wan Chai Bypass at WanChai East
5.3.3.
Water monitoring for Contract no. HK/2009/02
was commenced on 8 July 2010. Installations of silt screen and silt curtain
were completed in the reporting month. The proposed division of water
monitoring stations are summarized in Table 5.8 below.
Table 5.8
  Water Monitoring Stations for Contract no. HK/2009/02
Station Ref. |
Location |
Easting |
Northing |
WSD Salt Water Intake |
|||
WSD21 |
Wan Chai |
836220.8 |
815940.1 |
Cooling Water Intake |
|||
C5e |
Sun Hung Kai Centre (Eastern) |
836250.1 |
815932.2 |
C5w |
Sun Hung Kai Centre (Western) |
836248.1 |
815933.2 |
Remarks:
The water monitoring stations for
the dredging works under Contract No. HK/2009/01 should also include WSD9,
WSD17, WSD 21 and C5 if water quality monitoring at these locations have not
been carried out by others. Similarly, the water monitoring stations for the
dredging works under Contract No. HK/2009/02 should also include WSD7, WSD9,
WSD17, WSD 19, C1, C2, C3 and C4 if water quality monitoring at these locations
has not been carried out by others.
5.3.4.
The access to WSD7 is needed to via the gates that
are locked and under the control of LCSD between 1900hrs and 0700hrs from 10
July 2010. The
approval of access permission had been obtained from LCSD for the access to WSD7 in
Mid-August
2010. However, due to the wrong locking order of the series pad locks at the gate, water quality
monitoring could not be conducted on 30 July, 18 and 25 August 2010.<
cite="mailto:Lam20100204" datetime="2010-09-07T16:31">The access to WSD7 is
needed to via the >< cite="mailto:Lam20100204"
datetime="2010-09-07T16:31">gates that are locked>< cite="mailto:Lam20100204" datetime="2010-09-07T16:31"> and
under the control of LCSD between ><
cite="mailto:Lam20100204" datetime="2010-09-07T15:37">1800hrs >< cite="mailto:Lam20100204" datetime="2010-09-07T16:31">and >< cite="mailto:Lam20100204" datetime="2010-09-07T15:37">0800hrs
>< cite="mailto:Lam20100204"
datetime="2010-09-07T16:31">from 10 July 2010. Due to no access permission
obtained from LCSD in this reporting month, water monitoring >< cite="mailto:Lam20100204" datetime="2010-09-07T16:31">cannot>< cite="mailto:Lam20100204" datetime="2010-09-07T16:31"> be
conducted at WSD7 on 10/7/2010 ><
cite="mailto:Lam20100204" datetime="2010-09-07T16:31">at >< cite="mailto:Lam20100204" datetime="2010-09-07T16:31">mid-flood,
14/7/2010 at mid-flood and mid-ebb, 18/7/2010 at mid-flood and 19/7/2010 at
mid-ebb. LCSD has been liaised to request ><
cite="mailto:Lam20100204" datetime="2010-09-07T16:31">obtaining>< cite="mailto:Lam20100204" datetime="2010-09-07T16:31"> the
access permission in the reporting month.>
<
cite="mailto:Lam20100204" datetime="2010-09-07T16:34">Due to the >< cite="mailto:Lam20100204" datetime="2010-09-07T16:34">construction>< cite="mailto:Lam20100204" datetime="2010-09-07T16:34"> and >< cite="mailto:Lam20100204" datetime="2010-09-07T16:34">maintenance>< cite="mailto:Lam20100204" datetime="2010-09-07T16:34"> works
of the silt screen cover at C4e and C4w conducted by Chun Wo & Leader JV on
14/7/2010, no water monitoring was conducted at these stations during the
mid-ebb. >< cite="mailto:Lam20100204"
datetime="2010-09-07T16:34">
5.3.5.
<
cite="mailto:Lam20100204" datetime="2010-09-07T16:38">Due to>Due to < cite="mailto:Lam20100204" datetime="2010-09-08T19:19"> /span>>the black rainstorm warning
and red< cite="mailto:Lam20100204" datetime="2010-09-07T16:36">amber>
rainstorm warning in
force on
28 July 2010 and < cite="mailto:Lam20100204" datetime="2010-09-07T16:36">28 June>5 August 2010 respectively< cite="mailto:Lam20100204" datetime="2010-09-07T16:40"> >< cite="mailto:Lam20100204" datetime="2010-09-07T16:36">mid-ebb
and 28 July 2010>< cite="mailto:Lam20100204"
datetime="2010-09-07T16:40"> mid-flood><
cite="mailto:Lam20100204" datetime="2010-09-07T16:36">, strong Wind Signal No.
3 >< cite="mailto:Lam20100204"
datetime="2010-09-07T16:36">announced ><
cite="mailto:Lam20100204" datetime="2010-09-07T16:36">on 21/7/2010>,
< cite="mailto:Lam20100204" datetime="2010-09-08T19:19">no
water monitoring was conducted ><
cite="mailto:Lam20100204" datetime="2010-09-07T16:40">i>< cite="mailto:Lam20100204" datetime="2010-09-07T16:36">n these
days>< cite="mailto:Lam20100204"
datetime="2010-09-08T19:19">. >water quality was concerned substantially affected
by urban runoff, which cannot represent the normal impact condition of water
quality. Thus, the impact water
monitoring at
C1 to C4 on 28 July 2010 at mid-ebb tide and at all stations on 28 July and 5 August at mid-flood tide were cancelled.
<
cite="mailto:Lam20100204" datetime="2010-09-08T19:18">5.3.1.
><
cite="mailto:Lam20100204" datetime="2010-09-08T19:18"> >< cite="mailto:Lam20100204" datetime="2010-09-08T19:18">
5.3.6.
Water monitoring results measured in this
reporting period are reviewed and summarized. 
Details of water quality monitoring results and graphical presentation
can be referred in Appendix 5.4<>3>.
Table 5.9   Summary of Water Quality Monitoring Exceedances in Reporting
Month
Contract no. |
Water Monitoring Station |
Mid-flood |
Mid-ebb |
||||||||||
DO |
Turbidity |
SS |
DO |
Turbidity |
SS |
||||||||
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
AL |
LL |
||
HY/2009/11 |
WSD9 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
WSD10 |
0 |
0 |
0 |
0 |
1 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
|
WSD15 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
WSD17 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
1 |
|
C8 |
0 |
1 |
0 |
0 |
1 |
0 |
2 |
0 |
0 |
1 |
0 |
1 |
|
C9 |
0 |
0 |
0 |
0 |
3 |
0 |
1 |
0 |
0 |
1 |
1 |
1 |
HK/2009/01 |
WSD19 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
WSD20 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
2 |
|
WSD7 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
|
C1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
C2 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
C3 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
|
C4e |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
0 |
|
C4w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
HK/2009/02 |
C5e |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
|
C5w |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
WSD21 |
0 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Total |
1 |
2 |
0 |
0 |
5 |
0 |
7 |
6 |
0 |
2 |
1 |
6 |
< cite="mailto:Lam20100204"
datetime="2010-09-07T20:09"> >< cite="mailto:Lam20100204" datetime="2010-09-07T20:09">
Contract
no. HY/2009/11  Central  Wanchai Bypass, North Point Reclamation
5.4.1.
Non-inert C&D waste <
cite="mailto:Lam20100204" datetime="2010-09-08T19:16">and marine sediment were>was disposed of in
the reporting month. Details of the waste flow table are summarized in Table
5.10.
Table 5.10 Details
of Waste Disposal for Contract no. HY/2009/11
Waste
Type |
Quantity this month, m3 |
Cumulative Quantity-to-Date, m3 |
Disposal / Dumping Grounds |
Inert C&D materials disposed |
NIL |
NIL |
N/A |
Inert C&D materials recycled |
NIL |
NIL |
N/A |
Non-inert C&D materials disposed |
NIL< cite="mailto:Lam20100204" datetime="2010-09-07T16:41">0> |
NIL< cite="mailto:Lam20100204" datetime="2010-09-07T16:41">4.72> |
SENT Landfill |
Non-inert C&D materials recycled |
NIL |
NIL |
N/A |
Chemical waste disposed |
N/A |
N/A |
N/A |
Marine Sediment (Type 1  Open Sea Disposal) |
<
cite="mailto:Lam20100204" datetime="2010-09-07T16:42">7>1,500 (Bulk Volume) |
<
cite="mailto:Lam20100204" datetime="2010-09-08T19:23">70,000>71,500 (Bulk Volume) |
South of Cheung Chau |
Marine Sediment (Type 1  Open Sea Disposal
(Dedicate Sites) & Type 2  Confined Marine Disposal) |
<
cite="mailto:Lam20100204" datetime="2010-09-07T16:42">19>6,500 (Bulk Volume) |
<
cite="mailto:Lam20100204" datetime="2010-09-08T19:24">74,500>81,000 (Bulk Volume) |
East of Sha Chau |
< cite="mailto:Lam20100204" datetime="2010-09-07T17:07">5.4.1.
><
cite="mailto:Lam20100204" datetime="2010-09-07T17:07">As further checked and
reviewed the >< cite="mailto:Lam20100204"
datetime="2010-09-07T17:07">cumulative><
cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> >< cite="mailto:Lam20100204" datetime="2010-09-07T17:07">quantity>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> of
marine sediment >< cite="mailto:Lam20100204" datetime="2010-09-07T17:07">(Type 1
 Open Sea Disposal (Dedicate Sites) & Type 2  Confined Marine Disposal)>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07">, the
quantity and cumulative ><
cite="mailto:Lam20100204" datetime="2010-09-07T17:07">quantity>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> in May
2010 shall be 3,000m><
cite="mailto:Lam20100204" datetime="2010-09-07T17:07">3>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> and
46,500m>< cite="mailto:Lam20100204"
datetime="2010-09-07T17:07">3><
cite="mailto:Lam20100204" datetime="2010-09-07T17:07">. Thus, the cumulative >< cite="mailto:Lam20100204" datetime="2010-09-07T17:07">quantity>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> is
74,500 in this reporting month.>< cite="mailto:Lam20100204" datetime="2010-09-07T17:07"> >< cite="mailto:Lam20100204"
datetime="2010-09-07T17:07">
5.4.2.
There were marine sediments Type 1  Open Sea
Disposal and Type 1  Open Sea Disposal (Dedicate Sites) & Type 2  
Confined Marine Disposal marine sediment disposed in the reporting month. The
maximum dredging rate in North Point Shoreline Zone is 1,500m3 per
day in the reporting month, which is complied with the criteria listed in Table
5.10 of EIA Report Register No. AEIAR-125/2008.
Contract no. HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai
Bypass at HKCEC
5.4.3.
Inert and non- inert C&D waste were
disposed of for the site preparation works in this reporting month. Details of
the waste flow table are summarized in Table 5.11.
Table 5.11 Details
of Waste Disposal for Contract no. HK/2009/01
Waste
Type |
Quantity this month, m3 |
Cumulative Quantity-to-Date, m3 |
Disposal / Dumping Grounds |
Inert C&D materials disposed |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">49.19>152.35 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">49.19>201.54 |
TKO134 |
Inert C&D materials recycled |
NIL |
NIL |
N/A |
Non-inert C&D materials disposed |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">9.04>21.72 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">21.96>43.68 |
SENT Landfill |
Non-inert C&D materials recycled |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">2.89>0 |
2.89 |
N/A |
Chemical waste disposed |
<
cite="mailto:Lam20100204" datetime="2010-09-07T17:22">0.29>0 |
0.29 |
N/A |
Marine Sediment (Type 1  Open Sea Disposal) |
19856 <
cite="mailto:Lam20100204" datetime="2010-09-07T20:26">4131> (Bulk Volume) |
23987<
cite="mailto:Lam20100204" datetime="2010-09-07T20:24">4131> (Bulk Volume) |
South of Cheung Chau |
Marine Sediment (Type 1  Open Sea Disposal
(Dedicate Sites) & Type 2  Confined Marine Disposal) |
NIL |
NIL |
N/A |
<
cite="mailto:Lam20100204" datetime="2010-09-09T10:12">5.4.1.
><
cite="mailto:Lam20100204" datetime="2010-09-07T20:22">The Contractor>< cite="mailto:Lam20100204" datetime="2010-09-07T20:23"> >< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">clarified
the >< cite="mailto:Lam20100204"
datetime="2010-09-07T20:21">cumulative quantity><
cite="mailto:Lam20100204" datetime="2010-09-09T10:12"> shall be >< cite="mailto:Lam20100204" datetime="2010-09-07T20:23">12.92>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">m>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">3>< cite="mailto:Lam20100204" datetime="2010-09-07T20:24">
non-inert C&D material disposed in last reporting month>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">. Thus,
the sum of cumulative of ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:24">non-inert C&D
material>< cite="mailto:Lam20100204"
datetime="2010-09-09T10:12"> is ><
cite="mailto:Lam20100204" datetime="2010-09-07T20:24">21.96>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">m>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12">3>< cite="mailto:Lam20100204" datetime="2010-09-09T10:12"> in
this reporting month.><
cite="mailto:Lam20100204" datetime="2010-09-09T10:12">
5.4.4.
There were marine sediments Type 1  Open Sea
Disposal disposed in the reporting month. The maximum dredging rate is < cite="mailto:Lam20100204" datetime="2010-09-07T20:38">700m>< cite="mailto:Lam20100204" datetime="2010-09-07T20:38">3>< cite="mailto:Lam20100204" datetime="2010-09-07T20:38"> >845m3 per
day in the reporting month, which is complied with the criteria listed in Table
5.10 of EIA Report Register No. AEIAR-125/2008.
Contract no. HK/2009/02 - Wan Chai Development Phase II  Central  Wan
Chai Bypass at WanChai East
5.4.5.
Inert and non- inert C&D waste were
disposed of for the site preparation works in this reporting month. Details of
the waste flow table are summarized in Table 5.12.
Table 5.12 Details
of Waste Disposal for Contract no. HK/2009/02
Waste
Type |
Quantity this month, m3 |
Cumulative Quantity-to-Date, m3 |
Disposal / Dumping Grounds |
Inert C&D materials disposed |
<
cite="mailto:Lam20100204" datetime="2010-09-07T18:06">465>900.5 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T18:06">650>1550.5 |
TKO137 |
Inert C&D materials recycled |
NIL |
NIL |
N/A |
Non-inert C&D materials disposed |
<
cite="mailto:Lam20100204" datetime="2010-09-07T18:06">1>3.5 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T18:06">24>27.5 |
SENT Landfill |
Non-inert C&D materials recycled |
NIL |
NIL |
N/A |
Chemical waste disposed |
NIL |
NIL |
N/A |
Marine Sediment (Type 1  Open Sea Disposal) |
NIL |
NIL |
N/A |
Marine Sediment (Type 1  Open Sea Disposal
(Dedicate Sites) & Type 2  Confined Marine Disposal) |
<
cite="mailto:Lam20100204" datetime="2010-09-07T20:49">19458>31750 (Bulk Volume) |
<
cite="mailto:Lam20100204" datetime="2010-09-07T20:50">19458>51210 (Bulk Volume) |
East of Sha Chau |
5.4.6.
There were marine sediments (Type 1  Open Sea
Disposal)
disposed in the reporting month at a<
cite="mailto:Lam20100204" datetime="2010-09-07T20:57">. The>
maximum dredging rate < cite="mailto:Lam20100204"
datetime="2010-09-07T20:57">is 1>1,<
cite="mailto:Lam20100204" datetime="2010-09-07T20:51">490m>< cite="mailto:Lam20100204" datetime="2010-09-07T20:51">3>< cite="mailto:Lam20100204" datetime="2010-09-07T20:51"> >590m3 per
day< cite="mailto:Lam20100204" datetime="2010-09-07T20:57">
in the reporting month>. On-going ET site inspections observed that the temporary western
seawall has been partially constructed since early Aug 10 with no apparent water quality impact reported for the stations WSD21, C5e
and C5w, it is considered the maximum dredging rate at WCR can be stepped up to 6,000m3<
cite="mailto:Lam20100204" datetime="2010-09-07T20:51">,> as per the criteria under Table 5.10 of EIA Report Register No. AEIAR-125/2008 for dredging with WCR area.
6.0.1.
The Event Action Plan for construction noise,
air quality and water quality are presented in Appendix 6.1.
Contract no. HY/2009/11  Central
 Wanchai Bypass, North Point Reclamation
6.1.1.
<
cite="mailto:Lam20100204" datetime="2010-09-07T18:11">Two limit level
exceedances were recorded at M4a on 20 and 27 July 2010 during restricted
hours. The traffic noise from Island Eastern Corridor was the major noise
source contributed in the exceeded noise levels. >< cite="mailto:Lam20100204" datetime="2010-09-07T18:25">The
work undertaken>< cite="mailto:Lam20100204"
datetime="2010-09-07T18:25"> ><
cite="mailto:Lam20100204" datetime="2010-09-07T18:25">was complied with the
conditions under valid Construction Noise Permit no. GW-RS0371-10 during the
measurement>< cite="mailto:Lam20100204"
datetime="2010-09-07T18:25">. At such, it was considered as not project related
exceedances.>Two action level exceedances were recorded due the receipt of noise complaints dated 31 July and 12 August 2010
regarding the noise nuisance generated from the dredging works at North Point.
Contract no.
HK/2009/01 - Wan Chai Development Phase II  Central –Wanchai Bypass at HKCEC
6.1.2.
No exceedance was
recorded in the reporting month.
Contract no. HK/2009/02 - Wan
Chai Development Phase II  Central  Wan Chai Bypass at WanChai East
6.1.3.
Three limit level
exceedances during evening time were recorded <
cite="mailto:Lam20100204" datetime="2010-09-08T19:28">in reporting month>on 3, 10 and 17 August
2010. Major noise source was contributed from Tonnochy Road and water
sport competition at Wan Chai Training Pool. The dredging work was complied
with the conditions under valid Construction Noise Permit no. GW-RS0132-10
during the measurement. It is concluded as not related to the Project works. < cite="mailto:Lam20100204"
datetime="2010-09-07T18:26">However, baselin>< cite="mailto:Lam20100204" datetime="2010-09-07T18:26">e noise
level at M1 is 60.1dB(A) ><
cite="mailto:Lam20100204" datetime="2010-09-07T18:26">which>< cite="mailto:Lam20100204" datetime="2010-09-07T18:26"> is
needed to be reviewed in next ><
cite="mailto:Lam20100204" datetime="2010-09-07T18:26">reporting>< cite="mailto:Lam20100204" datetime="2010-09-07T18:26"> month.>
< cite="mailto:Lam20100204" datetime="2010-09-07T18:56">6.2.1.
>< cite="mailto:Lam20100204" datetime="2010-09-07T18:26">No air
monitoring was conducted in this reporting period.>< cite="mailto:Lam20100204" datetime="2010-09-07T18:56">
6.2.1.
One action level of 1
hour TSP was recorded at station CMA1b  Oil Street Community Liaison Centre on
24 August 2010. Burning joss paper activity was observed near the Oil Street
Community Centre between 23 and 25 August 2010 morning. It was no dust generating
construction activities undertaken near the
station CMA1b
during the air monitoring. Considering no further exceedance of 1 hour TSP was recorded at
the same day,
it was
concluded as an invalid exceedance.
Contract
no. HY/2009/11  Central  Wanchai Bypass, North Point Reclamation
6.3.1.
< cite="mailto:Lam20100204" datetime="2010-09-07T21:02">R>< cite="mailto:Lam20100204" datetime="2010-09-07T21:02">eferring>Referring to the
exceedances recorded in Table 5.9, the action and limit level
exceedances of turbidity and suspended solid were recorded at C8 and C9. The
turbid water quality was observed inside the silt screen while no abnormal
observation during the onsite monitoring. Investigation <
cite="mailto:Lam20100204" datetime="2010-09-09T11:57">was f>found that there were numerous
unknown outfalls from the nearby coastal area enclosed by the silt screen at C8
and C9. It causes the potential for accumulation and
trapping of pollutants behind the silt screens and may lead
to potential water quality deterioration at the seawater intake points. It
was concluded as < cite="mailto:Lam20100204"
datetime="2010-09-08T19:36">natural variation and >not project< cite="mailto:Lam20100204" datetime="2010-09-08T19:36">ed>
related exceedances.
6.3.2.
DO exceedances were occurred at all stations
relevant to Contract no. HY/2009/11 on 30 July 2010 at mid-ebb. Comparing with the overall DO level at
all monitoring stations and next consecutive water monitoring at the same day, relative low DO level at mid-ebb and no further
exceedances were recorded. It is concluded as
natural variation and not related to the project works.
6.3.3.
SS exceedances were recorded at WSD10 on 11 August
2010 and at WSD17 on 9 August 2010. The data were compared and reviewed that SS
level at the nearest monitoring stations to the marine works area were below
the action and limit level. It is concluded the exceedances not related to the
Project works.
<
cite="mailto:Lam20100204" datetime="2010-09-07T21:03">Occasional SS ><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12">exceedances were><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12"> >< cite="mailto:Lam20100204"
datetime="2010-09-08T11:12">occurred><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12"> at >< cite="mailto:Lam20100204"
datetime="2010-09-07T21:04">S><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12">tations >< cite="mailto:Lam20100204"
datetime="2010-09-07T21:04">WSD9,
WSD10, WSD15 and WSD17>< cite="mailto:Lam20100204" datetime="2010-09-08T11:12">.><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11"> Investigation was ><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11">found that><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11"> the
exceedances were due to the >< cite="mailto:Lam20100204"
datetime="2010-09-08T11:11">natural><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11"> variation and not related to the Project works.><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11">
< cite="mailto:Lam20100204"
datetime="2010-09-07T21:05">Frequent
>< cite="mailto:Lam20100204" datetime="2010-09-07T21:06">action and limit level
exceedances of dissolved oxygen >< cite="mailto:Lam20100204"
datetime="2010-09-08T11:12">were
recorded>< cite="mailto:Lam20100204" datetime="2010-09-07T21:06"> at Stations WSD9, WSD10,
WSD15, WSD17, C8 and C9 stations in the reporting month><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12">. The data were
compared and reviewed that >< cite="mailto:Lam20100204"
datetime="2010-09-07T21:06">dissolved
oxygen>< cite="mailto:Lam20100204" datetime="2010-09-08T11:12"> ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:06">concentrations ><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12">at the nearest ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:07">and furthest ><
cite="mailto:Lam20100204" datetime="2010-09-08T11:12">monitoring stations to the marine works area were ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:06">low>< cite="mailto:Lam20100204"
datetime="2010-09-08T11:12">.
>< cite="mailto:Lam20100204" datetime="2010-09-08T11:11">It><
cite="mailto:Lam20100204" datetime="2010-09-08T11:11"> was concluded as natural variation and no projected
related exceedances. >< cite="mailto:Lam20100204" datetime="2010-09-07T21:06">It was concluded that the
exceedances were due to
natural variation and not related to the Project works.>< cite="mailto:Lam20100204"
datetime="2010-09-08T11:13">
Contract no. HK/2009/01 -
Wan Chai Development Phase II  Central –Wanchai Bypass at HKCEC
6.3.4.
Action and limit level exceedances of dissolved
oxygen were recorded at Stations C2 on 13 August and C4e on 11 and 13 August
2010. Since no exceedance was
recorded at the stations
nearer to the marine works area and silt screens at C2 and C4e were in proper condition
during the monitoring, it is considered not related to the construction works.
6.3.5.
One limit level exceedance of SS was recorded at station C3 on 1 August
2010. SS level
at the monitoring stations nearer to the marine work area were reviewed and no exceedance was
recorded. It is considered that the exceedance was not related to Project.
6.3.6.
Occasional DO exceedance and SS exceedance were occurred
at stations WSD7, WSD19 ad WSD20. Inspection found that the exceedance was due to the
natural variation and not related to the project.<
cite="mailto:Lam20100204" datetime="2010-09-07T21:10">Since the dredging works
was commencement on 23 July 2010, the exceedances recorded at the monitoring
stations relevant to Contract no. HK/2009/01 were considered not related to the
Project works. No exceedance was recorded after the commencement of the
dredging work.>
Contract no. HK/2009/02 -
Wan Chai Development Phase II  Central  Wan Chai Bypass at WanChai East
6.3.7.
One <
cite="mailto:Lam20100204" datetime="2010-09-07T21:21">A>action level and one limit level
exceedances of dissolved oxygen were recorded at Stations C5e< cite="mailto:Lam20100204" datetime="2010-09-07T21:21">, C5w > /span>and WSD21 in the reporting month. The
data were compared and reviewed that dissolved oxygen concentrations at the
nearest and furthest monitoring stations to the marine works area were low. It
was concluded that the exceedances were due to natural variation and not
related to the Project works.
6.3.8.
Investigation for the <
cite="mailto:Lam20100204" datetime="2010-09-08T19:56">SS and >dissolved
oxygen exceedances recorded at relevant monitoring found that the condition of
silt screen and silt curtain are in proper condition and daily dredging rate
are complied with EP condition, the exceedances were considered as natural
variation and not related to the Project.
6.3.9.
Summary for notification of exceedances can
be referred to Appendix
6.2.
6.4.1.
There was no non-compliance from the site
audits in the reporting period. The observations and recommendations made in
each individual site audit session were presented in Section 8.
6.4.2.
No project-related non-compliance from
monitoring was recorded in the reporting month.
6.5.1.
There was no particular action taken since no
project-related non-compliance was recorded from the site audits and
environmental monitoring in the reporting period.
7.0.1.
According to Condition 3.4 of the
EP-356/2009, this section addresses the relevant cumulative construction impact
due to the concurrent activities of the current projects including the Central Reclamation
Phase III, Central-Wan Chai Baypass and Island Eastern Corridor Link projects.
7.0.2.
From the Monthly EM&A report (July 2010)
of Central Reclamation Phase III (CRIII) the key works in August 2010 are as
follows:
 -
Type A filling in FRAW and
FRAE above +2.5mPD;
 -
General filling works
above +2.5mPD in IRAE;
 -
Surcharging in FRAW and FRAE;
 -
Construction of cantilever
slab at caisson;
 -
Pile cap and base slab
construction at Culvert F;
 -
Construction of storm and
foul drainage and gullies in hinterlands for Road P2, Road D7, and Road D9;
 -
Construction of watermains
at Road D7;
 -
Road P2 Underpass ramp
structures;
 -
Precasting for retaining
wall (offsite);
 -
Installation of cooling
water mains for Tamar Development Project;
 -
Installation of cooling
mains discharge pipes in FRAE;
 -
Diaphragm wall and
barrettes for CWB Works;
 -
Excavation to formation
level at CWB works;
 -
Construction of CWB
structure; and
 -
Disposal of material
off-site to Government fill banks
7.0.3.
According to the construction programme of Central-Wan
Chai Baypass and Island Eastern Corridor Link projects, the major construction activity
under Wan Chai Development Phase II was the dredging works at North Point Reclamation
Stage 1(NPR1), Wan Chai Reclamation Stage 1(WCR1) and Hong Kong Convention and
Exhibition Centre Stage 1(HKCEC1) in the reporting month. The major
environmental impact was water quality impact at North Point and Wan Chai. No
major construction activities were undertaken in the Central-Wan Chai Baypass
and Island Eastern Corridor Link projects.
7.0.4.
The major environmental impacts generated from
the Central Reclamation Phase III were located along the coastline of Central
and Admiralty while dredging works at NPR1, WCR1 and HKCEC1 were in operation
in this reporting month. The dredging works was just commenced at WCR1 and < cite="mailto:Lam20100204" datetime="2010-09-07T18:59">HKCEC1 >Cross Harbour Water Mains
in this reporting month.  /span>Beside,
water quality mitigation measures were properly in place for the dredging works
in this reporting month. No project <
cite="mailto:Lam20100204" datetime="2010-09-07T18:59"> />related < cite="mailto:Lam20100204" datetime="2010-09-09T10:04">exceedance
were>exceedance
was recorded. Thus, it is evaluated that the cumulative construction
impact from the concurrent projects including Wan Chai Development Phase II and
Central Reclamation Phase III was insignificant.
8.0.1.
During this reporting month, weekly
environmental site audits were conducted for Contracts no. HY/2009/11,
HK/2009/01 and HK/2009/02. No non-conformance was identified during the site
audits.
8.0.2.
<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Five>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> >Four site inspections
for Contract no. HY/2009/11 were carried out during this reporting period. The
results of these inspections and outcomes are summarized in Table
8.1.
Table
8.1  Summary
of Environmental Inspections for
Contract no. HY/2009/11
Item |
Date |
Observations |
Action taken by Contractor |
Outcome |
100802_01 |
2-Aug-10 |
Floating refuses were observed inside the
silt screen at Sai
Wan Ho. It's recommended to clear
them and maintain the silt screen. |
Keep regular collection of the refuse inside silt
screen< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:23">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23"> the
silt screen.> |
Completion as observed on 10-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">6-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
100810_01 |
10-Aug-10 |
To avoid the release of
sediment during dredging, it is reminded that the grab shall be stayed for a
while before leaving to the barge. |
Review the practices and procedure for dredging
work< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:23">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23"> the
silt screen.> |
Completion as observed on 18-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">6-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
100818_01 |
18-Aug-10 |
Floating refuse was found inside the silt screen at Quarry
Bay. It's recommended to collect the
refuse everyday. |
Keep regular collection of the refuse inside silt
screen< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:23">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23"> the
silt screen.> |
Completion as observed on 24-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">6-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
100824_01 |
24-Aug-10 |
A gap was found at the
middle of the silt screen in City Garden. The contractor was reminded to
maintain and check the silt screen daily. |
Maintenance works of silt screen.< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Review the practices and procedure of the
dredging works> |
Completion as observed on 31-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">14-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
100824_02 |
24-Aug-10 |
Floating refuse was found inside the silt curtain at filling area NPR1A. The contractor
was reminded to collect the refuse daily. |
Keep regular collection of the refuse inside silt
screen< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:23">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23"> the
silt screen.> |
Completion as observed on 31-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">20-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
100824_03 |
24-Aug-10 |
A gap was found between
silt curtain and seawall at filling area NPR1A. The contractor
was reminded to tie the silt curtain as close as possible to
the seawall. |
Maintenance works of
silt screen.<
cite="mailto:Lam20100204" datetime="2010-09-07T21:23">Keep regular >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23"> the
silt curtain.> |
Completion as observed on 31-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:23">Complete as observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">20-Jul>< cite="mailto:Lam20100204" datetime="2010-09-07T21:23">-10> |
8.0.3.
< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Five>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> >Four site inspections
for Contract no. HK/2009/01 were carried out during this reporting period. The results of these inspections and
outcomes are summarized in Table 8.2.
Table 8.2   Summary
of Environmental Inspections for Contract no. HK/2009/01
Item |
Date |
Observations |
Action taken by Contractor |
Outcome |
100804_01 |
4-Aug-10 |
The contractor is recommended to provide a
protective zone for trees in construction site. |
Set up a protective zone for trees< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Cleared up the concrete debris.> |
Completion as observed
on 11-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as observed on
>< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">7-Jul><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">-10> |
100804_02 |
4-Aug-10 |
The contractor is reminded to clear the dust
within the construction site frequently. |
Daily clearance and inspection of dust in
construction site.< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Sedimentation
tanks were placed in the site area.> |
Completion as observed
on 11-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">
observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">7-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100804_03 |
4-Aug-10 |
The contractor is reminded to handle the oil from
generator properly. |
Keep regular maintaining the dip tray< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Regular maintain the site >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">tidiness>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">.> |
Completion as observed
on 11-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100804_04 |
4-Aug-10 |
Refuse
in silt curtain shall be cleared frequently. |
Daily clearance and inspection of silt screen. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Designed ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">area is>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">
provided for the sorting material> |
Completion as observed
on 11-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">
observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100804_05 |
4-Aug-10 |
Silt
curtain should be deployed before installing trial bored pile staging. |
Deploy silt curtain before installing trial bored
pile staging.<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Review the drainage
system > |
Completion as observed
on 11-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">
observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100811_01 |
11-Aug-10 |
Relocation
of floating materials of silt curtain was observed in C1. 
The Contractor is reminded
to
check and maintain the silt curtain to ensure its function in proper. |
Daily inspection of silt screen. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Relocate the material away from the tree> |
Completion as observed
on 19-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as observed>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> on
14><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100811_02 |
11-Aug-10 |
Refuses
were observed in the sedimentation tank. The Contractor is reminded to clear
it. |
Daily clearance and inspection of silt screen. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Covered the chemical container> |
Completion as observed
on 19-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100811_03 |
11-Aug-10 |
Water
in drip tray was found spillage.  The Contractor is reminded to maintain it
properly. |
Keep regular maintaining the dip tray< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> the
silt screen.> |
Completion as observed
on 19-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100819_01 |
19-Aug-10 |
The contractor is reminded to collect
refuse inside the silt screen regularly. |
Daily clearance and inspection of silt screen. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> the
silt curtain.> |
Completion as observed
on 25-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Outstanding >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as
observed on >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">14-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100819_02 |
19-Aug-10 |
The contractor is reminded to pack
sandbags closely the sea wall to prevent any oil discharge to sea directly
after heavy rain. |
Packed new sand bags< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Keep regular ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> the
silt curtain.> |
Completion as observed
on 25-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">22-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100819_03 |
19-Aug-10 |
Site runoff and
drainage collection system should be implemented. |
Implementation of
runoff and drainage collection system< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Cover
has been provided.> |
Completion as observed
on 19-Aug-10<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Complete >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on 2><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">6-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100825_01 |
25-Aug-10 |
Plug was found on drip tray, which was not covered well
at the construction site at Tsim Sha Tsui. The contractor was reminded to plug
all plugs on drip trays. |
Keep regular
maintaining the dip tray<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Keep regular >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">maintaining>< cite="mailto:Lam20100204" datetime="2010-09-07T21:25"> the
silt curtain.> |
Completion as observed
on 1-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">3-aug->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100825_02 |
25-Aug-10 |
The contractor was reminded to deploy
silt curtain between 2 barges during dredging works. |
Deploy silt curtain
before dredging<
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">Stockpile has been
cleared up.> |
Completion as observed
on 1-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">3-Aug->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100825_03 |
25-Aug-10 |
The contractor was reminded to pack
sandbags closely at Tsim Sha Tsui to prevent slurry leakage after rainstorm |
Packed new sand bags< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Regular check and main the plant and equipment > |
Completion as observed
on 1-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:25">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:25">3-Aug->< cite="mailto:Lam20100204" datetime="2010-09-07T21:25">10> |
100825_04 |
25-Aug-10 |
Gullies shall be covered to prevent
sediment discharge to drainage system. |
Covered the gullies by
geotextile |
Completion as observed
on 1-Sep-10 |
8.0.4.
<
cite="mailto:Lam20100204" datetime="2010-09-08T20:02">Five>< cite="mailto:Lam20100204" datetime="2010-09-08T20:02"> >Four site inspections
for Contract no. HK/2009/02 were carried out during this reporting period. The results of these inspections and
outcomes are summarized in Table 8.3.
Table 8.3   Summary
of Environmental Inspections for Contract no. HK/2009/02
Item |
Date |
Observations |
Action taken by Contractor |
Outcome |
100805_01 |
5-Aug-10 |
Floating refuse shall be cleared regularly. |
Daily clearance and inspection of silt screen. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Provided ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">proper>< cite="mailto:Lam20100204" datetime="2010-09-07T21:29"> drip
tray > |
Completion as observed on 12-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">8-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100805_02 |
5-Aug-10 |
Wheel washing facility shall be set-up at WSD pumping
station. |
Set-up wheel washing facility at the
vehicle entrance < cite="mailto:Lam20100204" datetime="2010-09-07T21:29">Reviewed
the function of sedimentation tank> |
Completion as observed on 12-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">8-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100812_01 |
12-Aug-10 |
Worn sand bags along
the seawall shall be replaced. |
Replaced new sand bags< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Reviewed and erected the proper temporary noise
barrier> |
Completion as observed on 26-Aug-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">8-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100812_02 |
12-Aug-10 |
Drip tray in WSD
station shall be repaired. |
Keep regular maintaining the dip tray< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Reviewed the drainage system> |
Completion as observed on 2-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">8-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100819_01 |
19-Aug-10 |
The contractor is
reminded to clear the U-channel of the drainage regularly particular after
rainfall. |
Daily clearance and inspection of U- channel. |
Completion as observed on 2-Sep-10 |
100819_02 |
19-Aug-10 |
The contractor is
reminded to commence the water treatment facilities in WSD pump station as
soon as possible. |
Commencement the operation of water treatment
facilities |
Completion as observed on 26-Aug-10 |
100826_01 |
26-Aug-10 |
Sand shall be cleared
at U-channel. |
Daily clearance and inspection of U- channel. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Replaced new sand bags> |
Completion as observed on 2-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">15-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100826_02 |
26-Aug-10 |
Refuse shall be cleared
up at small pet garden. |
Daily clearance and inspection of rubbish tank. < cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Keep clearance of floating refuse> |
Follow-up is needed in coming site inspection.< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">15-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
100826_03 |
26-Aug-10 |
The plug of drip tray
shall be closed to avoid oil leakage. |
Keep regular maintaining the dip tray< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Provided drip tray> |
Completion as observed on 2-Sep-10< cite="mailto:Lam20100204"
datetime="2010-09-07T21:29">Complete ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">as >< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">observed
on ><
cite="mailto:Lam20100204" datetime="2010-09-07T21:29">15-Jul->< cite="mailto:Lam20100204" datetime="2010-09-07T21:29">10> |
9.0.1.
<
cite="mailto:Lam20100204" datetime="2010-09-07T19:34">No >Two noise complaints < cite="mailto:Lam20100204" datetime="2010-09-07T19:35">was >were received dated 31 July 2010 and 12 August 2010. The
complaint dated
31 July 2010 was regarding the noise nuisance generated
from dredging work adjacent to Oil Street and three construction plant< cite="mailto:Lam20100204" datetime="2010-09-07T19:36">in the
reporting month. >< cite="mailto:Lam20100204"
datetime="2010-09-07T19:35">In the last reporting month, >< cite="mailto:Lam20100204" datetime="2010-09-07T19:35">the
complaint log no. 100615 recorded on 15 June 2010 >< cite="mailto:Lam20100204"
datetime="2010-09-07T19:35">was subsequently considered as an enquiry. RSS
clarified >< cite="mailto:Lam20100204"
datetime="2010-09-07T19:35">that><
cite="mailto:Lam20100204" datetime="2010-09-07T19:35"> the above issue was
logged as an enquiry rather than a complaint in Highway Department>< cite="mailto:Lam20100204" datetime="2010-09-07T19:35"> />< cite="mailto:Lam20100204" datetime="2010-09-07T19:35">s
record. >s
were operated concurrently. Noise monitoring results at stations M4b and M5b during the daytime
and evening time were reviewed and no exceedanced was recorded on 27 July and 3
August 2010. The
PME used in the dredging works were checked and confirmed compliance with the EP and valid CNP no.
GW-RS0371-10.
9.0.2.
Another noise complaint dated 12 August was received from Harbour Heights (Management)
Limited. They
received their resident complained on the noise nuisance generated from the dredging works at the marine works area adjacent to the Habour
Height during the period from 0700 to 2200. Reviewed the noise monitoring results at noise monitoring station at
Victoria Centre and City Garden during daytime and evening time, no exceedance was recorded
on 10 and 17 August 2010. The construction plants used in restricted hour
were complied with the valid CNP no. GW-RS0371-10.
9.0.3.
Based on the
investigation, these
complaints were
considered not valid from the CNP and EP point of view.
9.0.4.
The details of cumulative
complaint log and updated summary of complaints are
presented in Appendix 9.1.
9.0.5.
Cumulative statistic on complaints and
successful prosecutions are summarized in Table 9.1 and Table 9.2 respectively.
Table 9.1  Cumulative
Statistics on Complaints
Reporting Period |
No. of Complaints |
August 2010 |
<
cite="mailto:Lam20100204" datetime="2010-09-07T19:36">0>2 |
Project-to-Date |
<
cite="mailto:Lam20100204" datetime="2010-09-07T19:36">3>5 |
Table 9.2  Cumulative Statistics on Successful Prosecutions
Environmental Parameters |
Cumulative No. Brought Forward |
No. of Successful Prosecutions this month (Offence Date) |
Cumulative No. Project-to-Date |
Air |
- |
0 |
0 |
Noise |
- |
0 |
0 |
Water |
- |
0 |
0 |
Waste |
- |
0 |
0 |
Total |
- |
0 |
0 |
10.0.1. The
EM&A programme was carried out in accordance with the EM&A Manual
requirements, minor alterations to the programme proposed were made in response
to changing circumstances.
10.0.2. The
scheduled construction activities and the recommended mitigation measures for
the coming month are listed in Table 10.1.
Table
10.1 Construction
Activities and Recommended Mitigation Measures in Coming Reporting Month
Contract
No. |
Key Construction Works |
Recommended
Mitigation Measures |
HY/2009/11 |
 -
Floating
Out of Caisson Seawall,<
cite="mailto:Lam20100204" datetime="2010-09-03T15:02">Cons>< cite="mailto:Lam20100204" datetime="2010-09-03T15:02">truction
of Rock Mound,>  -
Installation
of Caisson Seawall,  -
Dredging
works,  -
Filling works;  -
Construction
of Seawall Block,  -
Works
for Fenders and rubber steps and < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>Drainage
works< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Floating Out of Caisson Seawall,>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Installation of Caisson Seawall,>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Dredging works,><
cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Laying of geo-textile,>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Drainage Works and>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00">  -
< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Seawall Block Installation> |
 -
To avoid concurrent noisy operation  -
To locate the plant and equipments far
away to the noise sensitive receivers  -
Daily visual inspection of silt screen and silt curtain to ensure its
operation properly  -
Daily clearance of floating debris behind the silt screen |
10.0.3. In
the coming month, the Contracts HK/2009/01 and HK/2009/02 are anticipated to be
commenced on site are summarized in Table 10.2. The construction
programmes of individual contracts are provided in Appendix 10.1.
Table 10.2 Summary
of Key Construction Activities of Individual Contract(s) to be commenced in Coming Reporting Month
Contract
No. |
Key Construction Activities |
Recommended Mitigation Measures |
HK/2009/01 |
 -
Installation of pipe pile wall at West Bridge < cite="mailto:Lam20100204" datetime="2010-09-03T15:00">WA2
interim Engineer’s Principal Office;>  -
Installation of trial bored pile  -
Assembly of crane to the custom made dredger  -
Dredging works for cross harbour watermains  -
Construction of wheel washing facilities  -
Commencement of temporary jetty construction  -
Implementation of TTM scheme for trial pit at
Convention Avenue (Area A1) and Harbour Road (Area A5)  -
Implementation of TTM scheme for Stage 1 pipe
laying for cooling mains and cross harbour water main at Convention Avenue (Area
A1)  -
Implementation of TTM scheme for Stage 1 pipe
laying for salt water main and optic fibre at Harbour Road (Area A5)  -
Implementation of TTM scheme for Stage 1 pipe
laying for cooling mains and cross harbour water main at Expo Drive near
HKCEC (Area B1)  -
Tree transplantation at Wan Chai and Tsim Sha
Tsui < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
>Builder’s work and structural modification for
Sea water pump houses / Transformer room of HKCEC<
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Sewerage pipelines for
interim Engineer’s Principal Office at works area WA1 & WA2;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Tree transplantation at
Tsim Sha Tsui and Wan Chai HKCEC VIP Drop-off Area>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59">;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Vibrocore for Marine
G.I. near Wan Chai West Pier shall be completed on early Aug 10;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Dredging works at
Victoria Habour>< cite="mailto:Lam20100204"
datetime="2010-09-03T14:59">;><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Fabrication of
submarine pipelines and on-land section pipelines shall be completed and
first batch of ivery><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Silt screen
installation for the existing cooling water intakes>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59">;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Trial pit Stage 1 at
Zone A1 along Convention Avenue shall be completed and trial pit for other
stages at the Convention Avenue><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Modification of
existing combine service inspection chamber at HKCEC (Area B1);>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Trial pit at Zone B1-1
near HKCEC VIP Drop-off area shall be completed and pipe laying works;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Routine maintenance and
clearance works for silt screens><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">;>< cite="mailto:Lam20100204" datetime="2010-09-03T14:59"> < cite="mailto:Lam20100204"
datetime="2010-09-03T14:59"> -
><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">Temporary piled staging
for pipe pile P1; and><
cite="mailto:Lam20100204" datetime="2010-09-03T14:59">  -
< cite="mailto:Lam20100204"
datetime="2010-09-03T14:59">Installation of trial bored pile staging platform> |
 -
To conform the installation and setting as in the silt screen
deployment plan  -
Frequency spray water on the dry dusty road and on the surface of
concrete breaking  -
To cover the dusty material or stockpile by impervious sheet  -
To space out noisy equipment and position
as far as possible from sensitive receiver.  -
To well maintain the mechanical equipments
/ machineries to avoid abnormal noise nuisance.  -
Machines and plant that may be in
intermittent use should be shut down between work periods or should be
throttled down to a minimum |
HK/2009/02 |
 -
Site
Clearance  -
Hoarding
Erection  -
Pre-bored
H-piles, ELS and excavation at WSD Pumping Station  -
Construction
of Salt Water Intake Culvert at Pet Garden  -
Road
Modification Works  -
Construction
of Cooling Mains Along Public Road  -
Construction
of Temporary Seawall  -
Dredging
for WCR 1  -
Tree
Transplanting < cite="mailto:Lam20100204"
datetime="2010-09-07T20:03"> -
>Equipments
Procurement for TKO 137<
cite="mailto:Lam20100204" datetime="2010-09-03T15:01">Site >< cite="mailto:Lam20100204" datetime="2010-09-03T15:01">C>< cite="mailto:Lam20100204" datetime="2010-09-03T15:01">learance>< cite="mailto:Lam20100204" datetime="2010-09-03T15:01">;>< cite="mailto:Lam20100204" datetime="2010-09-07T20:03"> <
cite="mailto:Lam20100204" datetime="2010-09-03T15:00">Hoarding >< cite="mailto:Lam20100204" datetime="2010-09-03T15:00">E>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00">rection>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00">;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Pre-bored H-piles, ELS and excavation at WSD
Pumping Station;>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Construction of ><
cite="mailto:Lam20100204" datetime="2010-09-03T15:00">Salt Water Intake
Culvert at Pet Garden><
cite="mailto:Lam20100204" datetime="2010-09-03T15:00">;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Road Modification Works;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Construction of Cooling Mains Along Public Road;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Construction of Temporary Seawall;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Dredging for WCR 1;>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> < cite="mailto:Lam20100204"
datetime="2010-09-03T15:00"> -
>< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Tree Transplanting; and>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00">  -
< cite="mailto:Lam20100204"
datetime="2010-09-03T15:00">Equipments ><
cite="mailto:Lam20100204" datetime="2010-09-03T15:00">Procurement>< cite="mailto:Lam20100204" datetime="2010-09-03T15:00"> for
TKO 137> |
 -
To cover the dusty material or stockpile by impervious sheet;  -
Frequency spray water on the dry dusty road and on the surface of
concrete breaking  -
To well maintain the mechanical equipments / machineries to avoid
abnormal noise nuisance and dark smoke emission  -
To conform the installation and setting as in the silt screen and silt curtain deployment plan  -
Movable noise barrier shall be deployed for
demolition works |